Challenging issues in the design and manufacturing of the European sectors of the ITER vacuum vessel

被引:9
|
作者
Dans, Andres [1 ]
Jucker, P. [1 ]
Bayon, A. [1 ]
Arbogast, J. -F. [1 ]
Caixas, J. [1 ]
Fernandez, J. [1 ]
Mico, G. [1 ]
Pacheco, J. [1 ]
Trentea, A. [1 ]
Stamos, V. [1 ]
机构
[1] Fus Energy, Torres Diagonal Litoral, E-08019 Barcelona, Spain
关键词
ITER vacuum vessel; Manufacturing; Welding; NDE inspection;
D O I
10.1016/j.fusengdes.2014.04.022
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
Fusion for Energy (F4E), the European Domestic Agency for the ITER project, has to supply seven sectors as part of the European contribution to the project. F4E signed the Procurement Agreement with ITER Organization (10) in 2009. After a call for tender in 2010, the contract for the manufacturing of seven sectors was placed in October 2010 to a consortium of three Italian companies, Ansaldo, Mangiarotti and Walter Tosto (AMW). The first sector in the manufacturing route is Sector 5 (later will come 4, 3, 2, 9, 8, 7). This paper will cover: the status of the engineering activities, design, procurement and preparation to begin the manufacturing in 2013. Also will be presented the statutory and regulatory requirements of the French Nuclear Safety regulator and the status of the relevant R&D mock-ups to demonstrate manufacturing feasibility control of distortions (using predictions with analysis and algorithms to change in real time the manufacturing route in order to correct such distortions, inspectability and metrology). Another important aspect at this stage of the manufacturing is qualification of activities like welding, Non-destructive Examination and Hot Forming. This paper describes the status of the activities currently in process in order to meet with the challenging design, schedule and high quality requirements of the project. (C) 2014 Published by Elsevier B.V.
引用
收藏
页码:1769 / 1774
页数:6
相关论文
共 50 条
  • [31] Design standard issues for ITER in-vessel components
    Majumdar, Saurin
    Fusion Engineering and Design, 1995, 29 (pt C): : 158 - 163
  • [32] Results from ITER vacuum vessel sector manufacturing development in Europe
    Jones, L.
    Duhovnik, J.
    Ginola, M.
    Huttunen, J.
    Ioki, K.
    Junek, L.
    Loewer, T.
    Luconi, U.
    Pick, M.
    Sanguinetti, G. -P.
    Slovacek, M.
    Utin, Y.
    FUSION ENGINEERING AND DESIGN, 2007, 82 (15-24) : 1942 - 1947
  • [33] DESIGN STANDARD ISSUES FOR ITER IN-VESSEL COMPONENTS
    MAJUMDAR, S
    FUSION ENGINEERING AND DESIGN, 1995, 29 : 158 - 163
  • [34] ITER vacuum vessel structural analysis completion during manufacturing phase
    Martinez, J. -M.
    Alekseev, A.
    Sborchia, C.
    Choi, C. H.
    Utin, Y.
    Jun, C. H.
    Terasawa, A.
    Popova, E.
    Xiang, B.
    Sannazaro, G.
    Lee, A.
    Martin, A.
    Teissier, P.
    Sabourin, F.
    Caixas, J.
    Fernandez, E.
    Zarzalejos, J. M.
    Kim, H. -S.
    Kim, Y. G.
    Privalova, E.
    Du, S.
    Wang, S.
    Albin, V.
    Gaucher, T.
    Borrelly, S.
    Cambazar, M.
    Sfarni, S.
    FUSION ENGINEERING AND DESIGN, 2016, 109 : 688 - 692
  • [35] Manufacturing progress on the first sector and lower ports for ITER vacuum vessel
    Ahn, H. J.
    Kim, H. S.
    Kim, G. H.
    Park, C. K.
    Hong, G. H.
    Jin, S. W.
    Lee, H. G.
    Jung, K. J.
    Lee, J. S.
    Kim, T. S.
    Won, J. G.
    Roh, B. R.
    Park, K. H.
    Sa, J. W.
    Choi, C. H.
    Sborchia, C.
    FUSION ENGINEERING AND DESIGN, 2016, 109 : 718 - 723
  • [36] Critical issues of the structural integrity of the ITER-FEAT vacuum vessel
    Sannazzaro, G
    Barabaschi, P
    Elio, F
    Ioki, K
    Miki, N
    Onozuka, M
    Utin, Y
    Verrecchia, M
    Yoshimura, H
    FUSION ENGINEERING AND DESIGN, 2001, 58-59 : 863 - 867
  • [37] Progress of ITER vacuum vessel
    Ioki, K.
    Bayon, A.
    Choi, C. H.
    Daly, E.
    Dani, S.
    Davis, J.
    Giraud, B.
    Gribov, Y.
    Hamlyn-Harris, C.
    Jun, C.
    Levesy, B.
    Kim, B. C.
    Kuzmin, E.
    Le Barbier, R.
    Martinez, J. -M.
    Pathak, H.
    Preble, J.
    Sa, J. W.
    Terasawa, A.
    Utin, Yu.
    Wang, X.
    FUSION ENGINEERING AND DESIGN, 2013, 88 (6-8) : 590 - 596
  • [38] Design and analysis of the vacuum vessel for RTO/RC-ITER
    Onozuka, M
    Ioki, K
    Johnson, G
    Kodama, T
    Sannazzaro, G
    Utin, Y
    FUSION ENGINEERING AND DESIGN, 2000, 51-52 : 249 - 255
  • [39] ITER vacuum vessel: Design review and start of procurement process
    Ioki, K.
    Bachmann, C.
    Chappuis, P.
    Cordier, J. -J.
    Giraud, B.
    Gribov, Y.
    Jones, L.
    Jun, C.
    Kim, B. C.
    Kuzmin, E.
    Pathak, H.
    Readman, P.
    Sugihara, M.
    Utin, Yu.
    Wang, X.
    Wu, S.
    FUSION ENGINEERING AND DESIGN, 2009, 84 (2-6) : 229 - 235
  • [40] Design and structural analysis of support structure for ITER vacuum vessel
    Takeda, N
    Ohmori, J
    Nakahira, M
    Shibanuma, K
    JOURNAL OF NUCLEAR SCIENCE AND TECHNOLOGY, 2004, 41 (12) : 1280 - 1286