Challenging issues in the design and manufacturing of the European sectors of the ITER vacuum vessel

被引:9
|
作者
Dans, Andres [1 ]
Jucker, P. [1 ]
Bayon, A. [1 ]
Arbogast, J. -F. [1 ]
Caixas, J. [1 ]
Fernandez, J. [1 ]
Mico, G. [1 ]
Pacheco, J. [1 ]
Trentea, A. [1 ]
Stamos, V. [1 ]
机构
[1] Fus Energy, Torres Diagonal Litoral, E-08019 Barcelona, Spain
关键词
ITER vacuum vessel; Manufacturing; Welding; NDE inspection;
D O I
10.1016/j.fusengdes.2014.04.022
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
Fusion for Energy (F4E), the European Domestic Agency for the ITER project, has to supply seven sectors as part of the European contribution to the project. F4E signed the Procurement Agreement with ITER Organization (10) in 2009. After a call for tender in 2010, the contract for the manufacturing of seven sectors was placed in October 2010 to a consortium of three Italian companies, Ansaldo, Mangiarotti and Walter Tosto (AMW). The first sector in the manufacturing route is Sector 5 (later will come 4, 3, 2, 9, 8, 7). This paper will cover: the status of the engineering activities, design, procurement and preparation to begin the manufacturing in 2013. Also will be presented the statutory and regulatory requirements of the French Nuclear Safety regulator and the status of the relevant R&D mock-ups to demonstrate manufacturing feasibility control of distortions (using predictions with analysis and algorithms to change in real time the manufacturing route in order to correct such distortions, inspectability and metrology). Another important aspect at this stage of the manufacturing is qualification of activities like welding, Non-destructive Examination and Hot Forming. This paper describes the status of the activities currently in process in order to meet with the challenging design, schedule and high quality requirements of the project. (C) 2014 Published by Elsevier B.V.
引用
收藏
页码:1769 / 1774
页数:6
相关论文
共 50 条
  • [21] Technical code issues of ITER vacuum vessel and their resolutions
    Nakahira, M
    JOURNAL OF NUCLEAR SCIENCE AND TECHNOLOGY, 2003, 40 (09) : 687 - 694
  • [22] Technical Code Issues of ITER Vacuum Vessel and their Resolutions
    Nakahira, M. (nakahirm@fusion.naka.jaeri.go.jp), 1600, Atomic Energy Society of Japan (40):
  • [23] Manufacturing Design Assessment of the Welded In-Wall Shield Rib for ITER Vacuum Vessel
    Kim, Y. G.
    Kim, H. S.
    Kim, G. H.
    Park, C. K.
    Moon, H. K.
    Hong, K. H.
    Chung, W. H.
    Martinez, J. M.
    IEEE TRANSACTIONS ON PLASMA SCIENCE, 2019, 47 (01) : 878 - 883
  • [24] Design progress of the ITER vacuum vessel and ports
    Utin, Y
    Chuyanov, V
    Elio, F
    Ioki, K
    Jones, L
    Kornarov, V
    Kuzmin, E
    Morimoto, M
    Nakahira, M
    Sannazzaro, G
    FUSION ENGINEERING AND DESIGN, 2005, 75-79 : 571 - 575
  • [25] THERMAL DESIGN OF THE ITER VACUUM VESSEL COOLING SYSTEM
    Carbajo, Juan J.
    Yoder, Graydon L.
    Kim, Seokho H.
    FUSION SCIENCE AND TECHNOLOGY, 2011, 60 (01) : 150 - 155
  • [26] Design of ITER vacuum vessel in-wall shielding
    Wang, X.
    Ioki, K.
    Morimoto, M.
    Choi, C. H.
    Utin, Y.
    Sborchia, C.
    TaiLhardat, O.
    Mille, B.
    Terasawa, A.
    Gribov, Y.
    Barabash, V.
    Polunovskiy, E.
    Dani, S.
    Pathak, H.
    Raval, J.
    Liu, S.
    Lu, M.
    Du, S.
    FUSION ENGINEERING AND DESIGN, 2014, 89 (7-8) : 1814 - 1819
  • [27] Final design of ITER vacuum vessel thermal shield
    Noh, Chang Hyun
    Nam, Kwanwoo
    Kang, Dong Kwon
    Kang, Kyung O.
    Chung, Wooho
    Ahn, Hee Jae
    Her, Nam Il
    Yu, Jie
    Hamlyn-Harris, Craig
    Utin, Yuri
    Choi, Chang Ho
    Ioki, Kimihiro
    FUSION ENGINEERING AND DESIGN, 2013, 88 (9-10) : 1896 - 1899
  • [28] Design finalization and start of construction of ITER vacuum vessel
    Ioki, K.
    Barabash, V.
    Choi, C. H.
    Cordier, J-J
    Daly, E.
    Dani, S.
    Davis, J.
    Giraud, B.
    Gribov, Y.
    Heitzenroeder, Ph
    Harnlyn-Harris, C.
    Johnson, G.
    Jones, L.
    Jun, C.
    Kim, B. C.
    Kuzmin, E.
    Le Barbier, R.
    Loesser, D.
    Martinez, J-M
    Merola, M.
    Pathak, H.
    Preble, J.
    Reich, J.
    Sa, J. W.
    Terasawa, A.
    Utin, Yu
    Wang, X.
    Wu, S.
    FUSION ENGINEERING AND DESIGN, 2011, 86 (6-8) : 593 - 597
  • [29] FABRICATION DESIGN AND CODE REQUIREMENTS FOR THE ITER VACUUM VESSEL
    Ahn, H. J.
    Kim, B. C.
    Sa, J. W.
    Lee, Y. J.
    Hong, K. H.
    Kim, H. S.
    Bak, J. S.
    Jung, K. J.
    Park, K. H.
    Kim, T. S.
    Lee, J. S.
    Kim, Y. K.
    Sung, H. J.
    Ioki, K.
    Giraud, B.
    Choi, C. H.
    Utin, Y.
    PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE VOL 1: CODES AND STANDARDS, 2012, : 275 - +
  • [30] Design analysis of the hinge support for the ITER vacuum vessel
    Kim, B. Y.
    Ahn, H. J.
    Ha, M. S.
    Kim, Y. K.
    Kim, H. S.
    Sa, J. W.
    Kim, B. C.
    Bak, J. S.
    Choi, C. H.
    Ioki, K.
    Wang, X.
    Bachmann, C.
    FUSION ENGINEERING AND DESIGN, 2011, 86 (9-11) : 2003 - 2007