共 50 条
- [5] Analysis of boil-off rate problem in Liquefied Natural Gas (LNG) receiving terminals. [J]. INTERNATIONAL CONFERENCE ON THE SUSTAINABLE ENERGY AND ENVIRONMENTAL DEVELOPMENT, 2019, 214
- [9] Flexible and cost-effective optimization of BOG (boil-off gas) recondensation process at LNG receiving terminals [J]. CHEMICAL ENGINEERING RESEARCH & DESIGN, 2012, 90 (10): : 1500 - 1505