Simulation of boil-off gas recovery and fuel gas optimization for increasing liquefied natural gas production

被引:0
|
作者
Widodo, Agung [1 ]
Muharam, Yuswan [1 ]
机构
[1] Univ Indonesia, Fac Engn, Dept Chem Engn, Depok 16424, Indonesia
关键词
Liquified natural gas; Boil-off gas; LNG production; BOG recovery system; LNG; SYSTEMS;
D O I
10.1016/j.egyr.2023.11.003
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
In a natural gas liquefaction plant, boil-off gas (BOG) is generated in both liquefaction and loading processes. During the holding mode (no loading operation), the fuel gas supply, including the BOG generated in the liquefaction process, is less than the fuel gas demand. Therefore, make-up gas is added to the fuel gas system. BOG recovery systems are designed to absorb the maximum amount of BOG during liquefied natural gas (LNG) loading to ships (loading mode). Additional BOG is generated during the loading process (loading mode). At this stage, the fuel gas supply is higher than the demand. To avoid fuel gas flaring, BOG from the liquefaction process is reduced by cooling the LNG from the main heat exchanger (MHE) to a lower temperature, which consequently reduces LNG production by more than 1%. This study aimed to optimize liquefaction, storage, loading, fuel gas and BOG recovery processes to increase LNG production. In this study, a natural gas liquefaction plant producing 8 mtpa (million tonnes/ year), where LNG production was limited by the capacity of the BOG recovery system and fuel gas demand, was modelled using UniSim software. In the model, the optimization of BOG recovery during the holding mode increased LNG production by 46,850 tonnes/ year. The volumetric flow rate of BOG generated during LNG loading was reduced by decreasing the temperature of the ship's cargo tanks, decreasing the loading pumps' discharge pressure, reducing the discharge pressure of the ship's compressors, and reducing the loading rate. This study shows that BOG generated during loading can be significantly reduced by around 50% from the initial rate, which increases LNG production by around 36,576 tonnes/ year. In total, the potential production increase from BOG recovery and fuel gas optimization was around 90,260 tonnes/ year or equivalent to 1.4 cargo of LNG per year.
引用
收藏
页码:4503 / 4515
页数:13
相关论文
共 50 条
  • [1] Advanced boil-off gas studies for liquefied natural gas
    Al Ghafri, Saif Z. S.
    Perez, Fernando
    Park, Ki Heum
    Gallagher, Liam
    Warr, Liam
    Stroda, Aaron
    Siahvashi, Arman
    Ryu, Yonghee
    Kim, Sungwoo
    Kim, Sung Gyu
    Seo, Yutaek
    Johns, Michael L.
    May, Eric F.
    [J]. APPLIED THERMAL ENGINEERING, 2021, 189
  • [2] Dynamic simulation and optimization of the operation of boil-off gas compressors in a liquefied natural gas gasification plant
    Namjin Jang
    Myoung Wook Shin
    Soo Hyoung Choi
    En Sup Yoon
    [J]. Korean Journal of Chemical Engineering, 2011, 28 : 1166 - 1171
  • [3] Dynamic simulation and optimization of the operation of boil-off gas compressors in a liquefied natural gas gasification plant
    Jang, Namjin
    Shin, Myoung Wook
    Choi, Soo Hyoung
    Yoon, En Sup
    [J]. KOREAN JOURNAL OF CHEMICAL ENGINEERING, 2011, 28 (05) : 1166 - 1171
  • [4] Dynamic Simulation Study for Boil-off Gas Minimization at Liquefied Natural Gas Exporting Terminals
    Kurle, Yogesh M.
    Xu, Qiang
    Palanki, Srinivas
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2018, 57 (17) : 5903 - 5913
  • [5] Sustainable boil-off gas utilization in liquefied natural gas production: Economic and environmental benefits
    Al-Sobhi, Saad Ali
    AlNouss, Ahmed
    Shamlooh, Mohamed
    Al-Nuaimi, Khalid
    AlMulla, Abdullah
    Khraisheh, Majeda
    [J]. JOURNAL OF CLEANER PRODUCTION, 2021, 296
  • [6] Minimizing Boil-Off Losses in Liquefied Natural Gas Transportation
    Hasan, M. M. Faruque
    Zheng, Alfred Minghan
    Karimi, I. A.
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2009, 48 (21) : 9571 - 9580
  • [7] Optimization model and application for the recondensation process of boil-off gas in a liquefied natural gas receiving terminal
    Wu, Ming
    Zhu, Zuoliang
    Sun, Dongxu
    He, Junnan
    Tang, Kai
    Hu, Benyuan
    Tian, Shizhang
    [J]. APPLIED THERMAL ENGINEERING, 2019, 147 : 610 - 622
  • [8] A prototype test of dynamic boil-off gas in liquefied natural gas tank containers
    Yu, Peng
    Yin, Yuan-chao
    Wei, Zhi-jun
    Yue, Qian-jin
    [J]. APPLIED THERMAL ENGINEERING, 2020, 180
  • [9] Retrofit design of a boil-off gas handling process in liquefied natural gas receiving terminals
    Park, Chansaem
    Song, Kiwook
    Lee, Sangho
    Lim, Youngsub
    Han, Chonghun
    [J]. ENERGY, 2012, 44 (01) : 69 - 78
  • [10] Advanced boil-off gas studies of liquefied natural gas used for the space and energy industries
    Al Ghafri, Saif Z. S.
    Swanger, Adam
    Park, Ki Heum
    Jusko, Vincent
    Ryu, Yonghee
    Kim, Sungwoo
    Kim, Sung Gyu
    Zhang, Dongke
    Seo, Yutaek
    Johns, Michael L.
    May, Eric F.
    [J]. ACTA ASTRONAUTICA, 2022, 190 : 444 - 454