共 50 条
- [5] Flexible and cost-effective optimization of BOG (boil-off gas) recondensation process at LNG receiving terminals [J]. CHEMICAL ENGINEERING RESEARCH & DESIGN, 2012, 90 (10): : 1500 - 1505
- [8] Dynamic simulation and optimization of the operation of boil-off gas compressors in a liquefied natural gas gasification plant [J]. Korean Journal of Chemical Engineering, 2011, 28 : 1166 - 1171
- [10] Analysis of boil-off rate problem in Liquefied Natural Gas (LNG) receiving terminals. [J]. INTERNATIONAL CONFERENCE ON THE SUSTAINABLE ENERGY AND ENVIRONMENTAL DEVELOPMENT, 2019, 214