Optimization model and application for the recondensation process of boil-off gas in a liquefied natural gas receiving terminal

被引:10
|
作者
Wu, Ming [1 ,3 ]
Zhu, Zuoliang [1 ]
Sun, Dongxu [1 ,3 ]
He, Junnan [1 ]
Tang, Kai [2 ]
Hu, Benyuan [2 ]
Tian, Shizhang [2 ]
机构
[1] Liaoning Shihua Univ, Coll Petr Engn, Fushun, Liaoning, Peoples R China
[2] PetroChina Jiangsu Liquefied Nat Gas Co Ltd, Nantong, Jiangsu, Peoples R China
[3] China Univ Petr East China, Coll Pipeline & Civil Engn, Qingdao, Shandong, Peoples R China
关键词
LNG receiving terminal; BOG; Recondensation process; Total power consumption; Optimization model; LNG; SIMULATION; STORAGE; DESIGN;
D O I
10.1016/j.applthermaleng.2018.10.117
中图分类号
O414.1 [热力学];
学科分类号
摘要
In a liquefied natural gas (LNG) receiving terminal, the recirculation flow rate and the branch flow rate entering the tank are important operating parameters that affect the amount of produced boil-off gas (BOG) in the system. However, the operating variables are generally kept unchanged when the flow rate of the external transportation LNG changes, resulting in additional power consumption and poor flexibility. Therefore, a total power consumption optimization model of the recondensation process was constructed for the varied flow rates of the external transportation. The total power consumption of the recondensation process was regarded as the objective function, and the recirculation flow rate and the branch flow rate were regarded as independent variables. Operating strategies for varied flow rates of the external transportation can be proposed using the model. The application of the research results at the Rudong LNG receiving terminal in Jiangsu, China indicated that the optimized operating strategy resulted in 2.93% annual energy reduction compared with the previous strategy, of which the energy reducing rate from June to October was 9.55%.
引用
收藏
页码:610 / 622
页数:13
相关论文
共 50 条
  • [1] Boil-Off Gas Two-Stage Compression and Recondensation Process at a Liquefied Natural Gas Receiving Terminal
    Li, Yajun
    Wen, Mingyang
    [J]. CHEMICAL ENGINEERING & TECHNOLOGY, 2017, 40 (01) : 18 - 27
  • [2] Retrofit design of a boil-off gas handling process in liquefied natural gas receiving terminals
    Park, Chansaem
    Song, Kiwook
    Lee, Sangho
    Lim, Youngsub
    Han, Chonghun
    [J]. ENERGY, 2012, 44 (01) : 69 - 78
  • [3] Advanced boil-off gas studies for liquefied natural gas
    Al Ghafri, Saif Z. S.
    Perez, Fernando
    Park, Ki Heum
    Gallagher, Liam
    Warr, Liam
    Stroda, Aaron
    Siahvashi, Arman
    Ryu, Yonghee
    Kim, Sungwoo
    Kim, Sung Gyu
    Seo, Yutaek
    Johns, Michael L.
    May, Eric F.
    [J]. APPLIED THERMAL ENGINEERING, 2021, 189
  • [4] Simulation of boil-off gas recovery and fuel gas optimization for increasing liquefied natural gas production
    Widodo, Agung
    Muharam, Yuswan
    [J]. ENERGY REPORTS, 2023, 10 : 4503 - 4515
  • [5] Flexible and cost-effective optimization of BOG (boil-off gas) recondensation process at LNG receiving terminals
    Li, Yajun
    Chen, Xingshui
    Chein, Ming-Hsiung
    [J]. CHEMICAL ENGINEERING RESEARCH & DESIGN, 2012, 90 (10): : 1500 - 1505
  • [6] Minimizing Boil-Off Losses in Liquefied Natural Gas Transportation
    Hasan, M. M. Faruque
    Zheng, Alfred Minghan
    Karimi, I. A.
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2009, 48 (21) : 9571 - 9580
  • [7] Dynamic optimization of the Boil-Off Gas (BOG) fluctuations at an LNG receiving terminal
    Li, Yajun
    Li, Yue
    [J]. JOURNAL OF NATURAL GAS SCIENCE AND ENGINEERING, 2016, 30 : 322 - 330
  • [8] Dynamic simulation and optimization of the operation of boil-off gas compressors in a liquefied natural gas gasification plant
    Namjin Jang
    Myoung Wook Shin
    Soo Hyoung Choi
    En Sup Yoon
    [J]. Korean Journal of Chemical Engineering, 2011, 28 : 1166 - 1171
  • [9] Dynamic simulation and optimization of the operation of boil-off gas compressors in a liquefied natural gas gasification plant
    Jang, Namjin
    Shin, Myoung Wook
    Choi, Soo Hyoung
    Yoon, En Sup
    [J]. KOREAN JOURNAL OF CHEMICAL ENGINEERING, 2011, 28 (05) : 1166 - 1171
  • [10] Analysis of boil-off rate problem in Liquefied Natural Gas (LNG) receiving terminals.
    Wlodek, T.
    [J]. INTERNATIONAL CONFERENCE ON THE SUSTAINABLE ENERGY AND ENVIRONMENTAL DEVELOPMENT, 2019, 214