Integrated scheduling of suppliers and multi-project activities for green construction supply chains under uncertainty

被引:44
|
作者
RezaHoseini, Ali [1 ]
Noori, Siamak [1 ]
Ghannadpour, Seyed Farid [1 ]
机构
[1] Iran Univ Sci & Technol, Sch Ind Engn, Tehran, Iran
关键词
Construction project; Green supply chain; Supplier selection; Project scheduling; Scenario fuzzy number; DECISION-MODEL; MANAGEMENT; PERFORMANCE; SYSTEM; SIMULATION; LOGISTICS; CONTEXT;
D O I
10.1016/j.autcon.2020.103485
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The green construction supply chain is one of the topics that have been recently discussed in relation to supply chain fundamentals, especially in the construction supply chain. Specifically, a project network consisting of several concurrent projects is managed with the aim of not only minimizing delays in all projects, but also simultaneously minimizing the logistical costs, e.g., procurement, ordering, and transportation costs, and pollution levels of vehicles. Although these projects operate independently, they are affected by common suppliers and final quality inspection by the common committee, thus requiring consistent project review. This study evaluates the construction supply chain using a mathematical model of bi-objective linear programming. To realize this objective, the actual environmental impacts of vehicles in terms of distance, pollution rate, and slope of the road are considered. This paper also discusses the synergy between supplier selection and project planning and scheduling in the proposed green supply chain. In addition, the issues of balancing the supplier selection, choosing the type of fleet, and project time planning, which has become a real operational challenge in the construction industry, are also investigated in the paper such that by minimizing the project delays, logistical costs and the propagation of greenhouse gases can be minimized as well. Moreover, in order to make the results more realistic, the levels of production capacity and costs are considered in an uncertain (fuzzy-probabilistic) environment under three economic conditions, i.e., pessimistic, normal, and optimistic.
引用
下载
收藏
页数:20
相关论文
共 50 条
  • [31] Coordinating supplier selection and project scheduling in resource-constrained construction supply chains
    Chen, Weiwei
    Lei, Lei
    Wang, Zhengwei
    Teng, Mingfei
    Liu, Junming
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (19) : 6512 - 6526
  • [32] Management Coordination for Multi-Participant Supply Chains Under Uncertainty
    Hjaila, Kefah
    Lainez-Aguirre, Jose M.
    Puigjaner, Luis
    Espuna, Antonio
    OPERATIONS RESEARCH PROCEEDINGS 2015, 2017, : 437 - 443
  • [33] Inventory-scheduling problem in sustainable project supply chain under uncertainty
    Mohsen Aliahmadi
    Saeed Yaghoubi
    Mohammad Sadeghi
    Environment Systems and Decisions, 2024, 44 (4) : 836 - 852
  • [34] Integrated supplier selection and order allocation under uncertainty in agile supply chains
    Dotoli, Mariagrazia
    Epicoco, Nicola
    Falagario, Marco
    PROCEEDINGS OF 2015 IEEE 20TH CONFERENCE ON EMERGING TECHNOLOGIES & FACTORY AUTOMATION (ETFA), 2015,
  • [35] Integrated scheduling of energy supply and demand in microgrids under uncertainty: A robust multi-objective optimization approach
    Wang, Luhao
    Li, Qiqiang
    Ding, Ran
    Sun, Mingshun
    Wang, Guirong
    ENERGY, 2017, 130 : 1 - 14
  • [36] Adaptive policies for multi-mode project scheduling under uncertainty
    Godinho, Pedro
    Branco, Fernando G.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 216 (03) : 553 - 562
  • [37] Robust project scheduling integrated with materials ordering under activity duration uncertainty
    Zhang, Yan
    Cui, Nanfang
    Hu, Xuejun
    Hu, Zhentao
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2020, 71 (10) : 1581 - 1592
  • [38] A filtering genetic programming framework for stochastic resource constrained multi-project scheduling problem under new project insertions
    Chen, HaoJie
    Ding, Guofu
    Zhang, Jian
    Li, Rong
    Jiang, Lei
    Qin, Shengfeng
    EXPERT SYSTEMS WITH APPLICATIONS, 2022, 198
  • [39] Green integrated scheduling of U-shaped automated terminals under uncertainty
    Xu B.
    Jie D.
    Li J.
    Yang Y.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2022, 28 (12): : 4057 - 4068
  • [40] Optimization of Multi-period Bilevel Supply Chains under Demand Uncertainty
    Nishi, Tatsushi
    Yoshida, Okihiro
    RESEARCH AND INNOVATION IN MANUFACTURING: KEY ENABLING TECHNOLOGIES FOR THE FACTORIES OF THE FUTURE - PROCEEDINGS OF THE 48TH CIRP CONFERENCE ON MANUFACTURING SYSTEMS, 2016, 41 : 508 - 513