A filtering genetic programming framework for stochastic resource constrained multi-project scheduling problem under new project insertions

被引:17
|
作者
Chen, HaoJie [1 ]
Ding, Guofu [1 ]
Zhang, Jian [1 ]
Li, Rong [1 ]
Jiang, Lei [1 ]
Qin, Shengfeng [2 ]
机构
[1] Southwest Jiaotong Univ, Sch Mech Engn, Chengdu 610031, Peoples R China
[2] Northumbria Univ, Dept Design, Newcastle Upon Tyne NE1 8ST, Tyne & Wear, England
关键词
Filtering evolution; Genetic programming; Priority rule; Stochastic resource constrained multi-project; scheduling; PRIORITY RULES; DISPATCHING RULES; HYPER-HEURISTICS; ALGORITHM; OPTIMIZATION; DURATIONS;
D O I
10.1016/j.eswa.2022.116911
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Multi-project management and uncertain environment are very common factors, and they bring greater challenges to scheduling due to the increase of problem complexity and response efficiency requirements. In this paper, a novel hyper-heuristic based filtering genetic programming (HH-FGP) framework is proposed for evolving priority rules (PRs) to deal with a multi-project scheduling problem considering stochastic activity duration and new project insertion together, namely the Stochastic Resource Constrained Multi-Project Scheduling Problem under New Project Insertions (SRCMPSP-NPI), within heuristic computation time. HH-FGP is designed to divide traditional evolution into sampling and filtering evolution for simultaneously filtering two kinds of parameters constituting PRs, namely depth range and attribute, to obtain more effective PRs. Based on this, the existing genetic search and local search are improved to meet the depth constraints, and a multiobjective evaluation mechanism is designed to achieve effective filtering. Under the existing benchmark, HHFGP is compared and analysed with the existing methods to verify its effectiveness.
引用
下载
收藏
页数:19
相关论文
共 50 条
  • [1] A two-stage genetic programming framework for Stochastic Resource Constrained Multi-Project Scheduling Problem under New Project Insertions
    Chen, HaoJie
    Zhang, Jian
    Li, Rong
    Ding, Guofu
    Qin, Shengfeng
    APPLIED SOFT COMPUTING, 2022, 124
  • [2] HEURISTIC FRAMEWORK FOR THE RESOURCE CONSTRAINED MULTI-PROJECT SCHEDULING PROBLEM
    KIM, SO
    SCHNIEDERJANS, MJ
    COMPUTERS & OPERATIONS RESEARCH, 1989, 16 (06) : 541 - 556
  • [3] A genetic algorithm for the resource constrained multi-project scheduling problem
    Goncalves, J. F.
    Mendes, J. J. M.
    Resende, M. G. C.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) : 1171 - 1190
  • [4] Research on priority rules for the stochastic resource constrained multi-project scheduling problem with new project arrival
    Chen, HaoJie
    Ding, Guofu
    Zhang, Jian
    Qin, Shengfeng
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 137
  • [5] Hybrid genetic algorithm for resource constrained multi-project scheduling problem
    Ying, Ying
    Shou, Yong-Yi
    Li, Min
    Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2009, 43 (01): : 23 - 27
  • [6] A Hybrid Genetic Algorithm for the Resource Constrained Multi-Project Scheduling Problem
    Li, Jinghua
    Liu, Wenjian
    ETFA 2005: 10TH IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOL 2, PROCEEDINGS, 2005,
  • [7] Resource-Constrained Multi-Project Reactive Scheduling Problem With New Project Arrival
    Peng, Wuliang
    Yu, Dongmin
    Lin, Jiali
    IEEE ACCESS, 2023, 11 : 64370 - 64382
  • [8] On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem
    Wang, Yanting
    He, Zhengwen
    Kerkhove, Louis-Phillipe
    Vanhoucke, Mario
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 114 : 223 - 234
  • [9] A genetic algorithm with resource buffers for the resource-constrained multi-project scheduling problem
    Bredael, Dries
    Vanhoucke, Mario
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 315 (02) : 19 - 34
  • [10] Development of hybrid genetic algorithm for the resource constrained multi-project scheduling problem
    Liu, Wenjian
    Li, Jinghua
    PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE 2005, VOL 3, PTS A AND B, 2005, : 1075 - 1082