Integrated scheduling of suppliers and multi-project activities for green construction supply chains under uncertainty

被引:44
|
作者
RezaHoseini, Ali [1 ]
Noori, Siamak [1 ]
Ghannadpour, Seyed Farid [1 ]
机构
[1] Iran Univ Sci & Technol, Sch Ind Engn, Tehran, Iran
关键词
Construction project; Green supply chain; Supplier selection; Project scheduling; Scenario fuzzy number; DECISION-MODEL; MANAGEMENT; PERFORMANCE; SYSTEM; SIMULATION; LOGISTICS; CONTEXT;
D O I
10.1016/j.autcon.2020.103485
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The green construction supply chain is one of the topics that have been recently discussed in relation to supply chain fundamentals, especially in the construction supply chain. Specifically, a project network consisting of several concurrent projects is managed with the aim of not only minimizing delays in all projects, but also simultaneously minimizing the logistical costs, e.g., procurement, ordering, and transportation costs, and pollution levels of vehicles. Although these projects operate independently, they are affected by common suppliers and final quality inspection by the common committee, thus requiring consistent project review. This study evaluates the construction supply chain using a mathematical model of bi-objective linear programming. To realize this objective, the actual environmental impacts of vehicles in terms of distance, pollution rate, and slope of the road are considered. This paper also discusses the synergy between supplier selection and project planning and scheduling in the proposed green supply chain. In addition, the issues of balancing the supplier selection, choosing the type of fleet, and project time planning, which has become a real operational challenge in the construction industry, are also investigated in the paper such that by minimizing the project delays, logistical costs and the propagation of greenhouse gases can be minimized as well. Moreover, in order to make the results more realistic, the levels of production capacity and costs are considered in an uncertain (fuzzy-probabilistic) environment under three economic conditions, i.e., pessimistic, normal, and optimistic.
引用
下载
收藏
页数:20
相关论文
共 50 条
  • [21] Multi-project scheduling problem under shared multi-skill resource constraints
    Meya Haroune
    Cheikh Dhib
    Emmanuel Neron
    Ameur Soukhal
    Hafed Mohamed Babou
    Mohamedade Farouk Nanne
    TOP, 2023, 31 : 194 - 235
  • [22] Sustainable supply chains: An integrated modeling approach under uncertainty
    Mota, Bruna
    Gomes, Maria Isabel
    Carvalho, Ana
    Barbosa-Povoa, Ana Paula
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2018, 77 : 32 - 57
  • [23] Multi-project resource allocation under uncertainty: a concept of using resource buffers
    Khatun, Taskia
    Hiekata, Kazuo
    Nakashima, Takuya
    Journal of Advanced Mechanical Design, Systems and Manufacturing, 2024, 18 (07)
  • [24] Green and sustainable tunnel maintenance activities scheduling under uncertainty
    Sun, Yufeng
    Hu, Min
    Lin, Shumin
    JOURNAL OF CLEANER PRODUCTION, 2021, 297
  • [25] An outer–inner fuzzy cellular automata algorithm for dynamic uncertainty multi-project scheduling problem
    Wenbin Hu
    Huan Wang
    Chao Peng
    Huang Wang
    Huangle Liang
    Bo Du
    Soft Computing, 2015, 19 : 2111 - 2132
  • [26] A Benders decomposition algorithm for the multi-mode resource-constrained multi-project scheduling problem with uncertainty
    Sadeghloo, Maryam
    Emami, Saeed
    Divsalar, Ali
    ANNALS OF OPERATIONS RESEARCH, 2024, 339 (03) : 1637 - 1677
  • [27] Integrated design and operation of remnant inventory supply chains under uncertainty
    Rajgopal, Jayant
    Wang, Zhouyan
    Schaefer, Andrew J.
    Prokopyev, Oleg A.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 214 (02) : 358 - 364
  • [28] A robust multi-project scheduling problem under a resource dedication-transfer policy
    Zhao, Yan
    Hu, Xuejun
    Wang, Jianjiang
    Cui, Nanfang
    ANNALS OF OPERATIONS RESEARCH, 2024, 337 (01) : 425 - 457
  • [29] Resource allocation under uncertainty in a multi-project matrix environment: Is organizational conflict inevitable?
    Department of Industrial Engineering and Management, Sami Shamoon College of Engineering, Beer Sheva, Israel
    不详
    International Journal of Project Management, 2008, 26 (08) : 773 - 788
  • [30] An outer-inner fuzzy cellular automata algorithm for dynamic uncertainty multi-project scheduling problem
    Hu, Wenbin
    Wang, Huan
    Peng, Chao
    Wang, Huang
    Liang, Huangle
    Du, Bo
    SOFT COMPUTING, 2015, 19 (08) : 2111 - 2132