An outer-inner fuzzy cellular automata algorithm for dynamic uncertainty multi-project scheduling problem

被引:15
|
作者
Hu, Wenbin [1 ]
Wang, Huan [1 ]
Peng, Chao [1 ]
Wang, Huang [1 ]
Liang, Huangle [1 ]
Du, Bo [1 ]
机构
[1] Wuhan Univ, Sch Comp, Wuhan 430072, Hubei, Peoples R China
关键词
Cellular automata; Fuzzy cell; Uncertainty; Multi-project scheduling; Outer-inner; PARALLEL GAUSSIAN-ELIMINATION; FROG-LEAPING ALGORITHM; GENETIC ALGORITHM; OPTIMIZATION; POLICIES; AUCTION; RCPSP;
D O I
10.1007/s00500-014-1395-5
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Current research on the resource-constrained multi-project scheduling problem(RCMPSP) mainly focuses on the constrained resources or other single uncertainty factor that cannot satisfy the practical need of enterprise management. This paper addresses the dynamic uncertain multi-project scheduling problem (DUMPSP), which alleviates the above problem of RCMPSP by synthesizing the analysis of uncertainty, sensitivity, and lean management of resources and durations. An outer-inner uncertainty fuzzy cellular automata algorithm (OIUFCA) is proposed to solve DUMPSP. The problem is divided into several parts: (1) fuzzy cell is employed to describe the project cell and process cell in DUMPSP; (2) a fuzzy outer cellular automata (FOCA) model is defined to solve the project scheduling of DUMPSP, and a fuzzy inner cellular automata (FICA) model is constructed to solve the process scheduling; (3) multi-level feedback strategy (MFS) is further proposed to deal with the multi-level dual-stage optimization problem of DUMPSP. Besides, FOCA and FICA model execute co-evolution under the control of MFS. Extensive experiments are carried out to evaluate the performances of OIUFCA with other state-of-the-art algorithms. It is revealed that OIUFCA achieves a better performance in success rate and convergence speed in solving DUMPSP, and OIUFCA has a good solution under different conditions of uncertainty, sensibility, and lean management.
引用
下载
收藏
页码:2111 / 2132
页数:22
相关论文
共 50 条
  • [1] An outer–inner fuzzy cellular automata algorithm for dynamic uncertainty multi-project scheduling problem
    Wenbin Hu
    Huan Wang
    Chao Peng
    Huang Wang
    Huangle Liang
    Bo Du
    Soft Computing, 2015, 19 : 2111 - 2132
  • [2] A genetic algorithm for the resource constrained multi-project scheduling problem
    Goncalves, J. F.
    Mendes, J. J. M.
    Resende, M. G. C.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) : 1171 - 1190
  • [3] A Benders decomposition algorithm for the multi-mode resource-constrained multi-project scheduling problem with uncertainty
    Sadeghloo, Maryam
    Emami, Saeed
    Divsalar, Ali
    ANNALS OF OPERATIONS RESEARCH, 2024, 339 (03) : 1637 - 1677
  • [4] Hybrid genetic algorithm for resource constrained multi-project scheduling problem
    Ying, Ying
    Shou, Yong-Yi
    Li, Min
    Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2009, 43 (01): : 23 - 27
  • [5] A Hybrid Genetic Algorithm for the Resource Constrained Multi-Project Scheduling Problem
    Li, Jinghua
    Liu, Wenjian
    ETFA 2005: 10TH IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOL 2, PROCEEDINGS, 2005,
  • [6] Multi-Project Scheduling by Fuzzy Combinatorial Auction
    Cheng, Chi-Bin
    Lo, Chiao-Yu
    2017 3RD IEEE INTERNATIONAL CONFERENCE ON CYBERNETICS (CYBCONF), 2017, : 61 - 66
  • [7] Development of hybrid genetic algorithm for the resource constrained multi-project scheduling problem
    Liu, Wenjian
    Li, Jinghua
    PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE 2005, VOL 3, PTS A AND B, 2005, : 1075 - 1082
  • [8] A Modified Differential Evolution Algorithm for Resource Constrained Multi-project Scheduling Problem
    Yan, Rui
    Li, Weijia
    Jiang, Ping
    Zhou, Yinzhi
    Wu, Guoqing
    JOURNAL OF COMPUTERS, 2014, 9 (08) : 1922 - 1927
  • [9] A three-stage decomposition algorithm for decentralized multi-project scheduling under uncertainty
    Liu, Dongning
    Xu, Zhe
    Li, Feifei
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 160
  • [10] A storage allocation algorithm for outbound containers based on the outer-inner cellular automaton
    Hu, Wenbin
    Wang, Huan
    Min, Zhenyu
    INFORMATION SCIENCES, 2014, 281 : 147 - 171