Lead time prediction in unbalanced production systems

被引:7
|
作者
Ruben, RA
Mahmoodi, F [1 ]
机构
[1] Clarkson Univ, Sch Business, Potsdam, NY 13699 USA
[2] Iowa State Univ Sci & Technol, Coll Business, Dept Logist Operat & MIS, Ames, IA 50011 USA
关键词
D O I
10.1080/002075400188816
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Whether job due dates are set internally or externally, it is critical for the shop floor controller to be able to accurately predict job lead times. Previous research has shown that utilizing information on the congestion levels along a job's route is more valuable than overall shop congestion levels when predicting job lead times. While this information is easily attained in a simulation model, in industrial applications the task may be considerably more difficult, especially when lot splitting is used to accelerate material flow. We examine the effectiveness of three lead time estimation procedures which utilize different shop information in bottleneck-constrained production systems where lot splitting is practiced under a variety of experimental conditions. The results indicate that accurate lead time estimates can be obtained using information pertaining solely to the bottleneck work centre when the bottleneck is at an entry work centre. This offers operations managers a substantial ease in implementation over previously reported methods. The results also show that the operations managers interested in accurately estimating job lead times are well advised to take advantage of the excess capacity at non-bottleneck work centres by performing additional setups, and take measures that reduce bottleneck shiftiness.
引用
收藏
页码:1711 / 1729
页数:19
相关论文
共 50 条
  • [21] Optimal real time control in unbalanced transmission power systems
    Fratkin, AI
    2001 IEEE POWER ENGINEERING SOCIETY WINTER MEETING, CONFERENCE PROCEEDINGS, VOLS 1-3, 2001, : 1437 - 1442
  • [22] Adaptive lead time quotation in a pull production system with lead time responsive demand
    Selcuk, Baris
    JOURNAL OF MANUFACTURING SYSTEMS, 2013, 32 (01) : 138 - 146
  • [23] Consequences of planned lead time adaptions in scope of the Lead Time Syndrome of Production Control
    Windt, K.
    Knollmann, M.
    CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2014, 63 (01) : 405 - 408
  • [24] The shape of protective capacity in unbalanced production systems with unplanned machine downtime
    Patti, Anthony L.
    Watson, Kevin
    Blackstone, John H., Jr.
    PRODUCTION PLANNING & CONTROL, 2008, 19 (05) : 486 - 494
  • [25] Production Lots as Determinant of Paper Production Lead Time Performance
    Koskinen, Pekka
    Hilmola, Olli-Pekka
    INTERNATIONAL JOURNAL OF INFORMATION SYSTEMS AND SUPPLY CHAIN MANAGEMENT, 2009, 2 (04) : 63 - 79
  • [26] Order Production Planning Based on Lead Time and Balanced Production
    Chen, Xin-lin
    Wang, Xiang-gang
    2009 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2009, : 994 - 998
  • [27] Prediction Time in Anticipatory Systems
    Johansson, Birger
    Balkenius, Christian
    ANTICIPATORY BEHAVIOR IN ADAPTIVE LEARNING SYSTEMS, 2009, 5499 : 283 - 300
  • [28] An analytical approach to improving due-date and lead-time dynamics in production systems
    Duffle, N.
    Bendul, J.
    Knollmann, M.
    JOURNAL OF MANUFACTURING SYSTEMS, 2017, 45 : 273 - 285
  • [29] URLLC occasional large time delay prediction based on unbalanced regression and LSTM
    Liu, Zhuang
    Sheng, Zhichao
    PHYSICAL COMMUNICATION, 2022, 54
  • [30] Lead time estimation for modular production plants
    Sievers, Stefan
    Seifert, Tim
    Franzen, Marcel
    Schembecker, Gerhard
    Bramsiepe, Christian
    CHEMICAL ENGINEERING RESEARCH & DESIGN, 2017, 128 : 96 - 106