Adaptive lead time quotation in a pull production system with lead time responsive demand

被引:8
|
作者
Selcuk, Baris [1 ]
机构
[1] Bahcesehir Univ, Coll Engn, Dept Ind Engn, Istanbul, Turkey
关键词
Kanban; Lead time; Markov chain; Quasi-Birth-Death; Tardiness; PERFORMANCE EVALUATION; EMBEDDING JIT; DESIGN; SIMULATION;
D O I
10.1016/j.jmsy.2012.07.017
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, a single-stage single-class kanban controlled manufacturing system is considered, where the problem is quoting accurate lead times for orders that are generated by an MRP system. Order release mechanism as in classical MRP is sensitive to the changes in the lead time according to the concept of lead time syndrome. The objective is to establish a cost effective lead time quoting procedure. The problem is modeled as a two-dimensional Markov chain, and it is solved explicitly by using matrix geometric techniques. Comparative analysis is done between static and dynamic lead time quoting procedures, and significant cost benefits of the dynamic procedure are shown under various scenarios. Guidelines for setting design parameters such as the number of kanbans and the frequency of updating the lead time are provided through numerical tests. (C) 2012 The Society of Manufacturing Engineers. Published by Elsevier Ltd. All rights reserved.
引用
收藏
页码:138 / 146
页数:9
相关论文
共 50 条
  • [1] Lead time and response time in a pull production control system
    Kim, I
    Tang, CS
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 101 (03) : 474 - 485
  • [2] Ordering, Pricing, and Lead-Time Quotation Under Lead-Time and Demand Uncertainty
    Wu, Zhengping
    Kazaz, Burak
    Webster, Scott
    Yang, Kum-Khiong
    [J]. PRODUCTION AND OPERATIONS MANAGEMENT, 2012, 21 (03) : 576 - 589
  • [3] Lead Time Quotation under Time-Varying Demand and Capacity
    Thanh-Ha Nguyen
    Wright, Mike
    [J]. PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND SERVICE SYSTEM (CSSS), 2014, 109 : 33 - 37
  • [4] Coping with production time variability via dynamic lead-time quotation
    Gökçe Kahveciog̃lu
    Barış Balcıog̃lu
    [J]. OR Spectrum, 2016, 38 : 877 - 898
  • [5] Coping with production time variability via dynamic lead-time quotation
    Kahvecioglu, Gokce
    Balcioglu, Baris
    [J]. OR SPECTRUM, 2016, 38 (04) : 877 - 898
  • [6] Effect of a lead time-dependent cost on lead time quotation, pricing, and capacity decisions in a stochastic make-to-order system with endogenous demand
    Albana, Abduh Sayid
    Frein, Yannick
    Hammami, Ramzi
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2018, 203 : 83 - 95
  • [7] Dynamic lead time quotation under responsive inventory and multiple customer classes
    Savasaneril, Secil
    Sayin, Ece
    [J]. OR SPECTRUM, 2017, 39 (01) : 95 - 135
  • [8] Dynamic lead time quotation under responsive inventory and multiple customer classes
    Secil Savasaneril
    Ece Sayin
    [J]. OR Spectrum, 2017, 39 : 95 - 135
  • [9] Lead Time Quotation Under MTO and MTS Delivery Modes with Endogenous Demand
    Asgari, E.
    Frein, Y.
    Hammami, R.
    [J]. 2018 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2018, : 22 - 26
  • [10] Production and lead time quotation under imperfect shop floor information
    Kaman, Cumhur
    Savasaneril, Secil
    Serin, Yasemin
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 144 (02) : 422 - 431