The scheme and implementation of vessel hydrostatic test in cpr1000 nuclear power plant

被引:0
|
作者
Zhang, Zhenguo [1 ]
Feng, Huixing [1 ]
机构
[1] Suzhou Nucl Power Res Inst Co Ltd, Shenzhen 518124, Guangdong, Peoples R China
关键词
D O I
10.1088/1755-1315/227/2/022014
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Nuclear vessels hydrostatic test involves many important systems and key equipment in CPR1000 models nuclear power plant. This paper introduces how to make the nuclear vessel hydrostatic test scheme and the implementation of vessel hydrostatic test. The scheme of nuclear vessel hydrostatic test contains hydrostatic test plan scheduling, hydrostatic test Isolation Boundary, cutting and welding of hydrostatic test aspect, The implementation of nuclear vessel hydrostatic test contains instrument of hydrostatic test, working file of hydrostatic test, manpower arrangement of hydrostatic test, actual execution of hydrostatic test and technical difficulties of vessel hydrostatic test. This paper mainly discusses the scheme and implementation of nuclear vessel hydrostatic test.
引用
收藏
页数:4
相关论文
共 50 条
  • [21] Study on the Effects of Accident Tolerant Fuels on the Safety of CPR1000 Nuclear Power Plants
    Liu, Pingping
    Liu, Mengying
    Xu, Haode
    Hedongli Gongcheng/Nuclear Power Engineering, 2024, 45 (06): : 98 - 105
  • [22] Optimal Control of Stretch-out Operation for CPR1000 Nuclear Power Unit
    Yang, Zhang
    Song, Yinlei
    Tian, Wei
    Hedongli Gongcheng/Nuclear Power Engineering, 2022, 43 (03): : 144 - 150
  • [23] Research on experiment evaluation method for thermal ratchet of nuclear equipment at CPR1000 nuclear power station
    Wu, Shijian
    Jing, Ting
    Xiong, Guangming
    Liu, Le
    Hedongli Gongcheng/Nuclear Power Engineering, 2014, 35 (05): : 94 - 96
  • [24] THE ANALYTICAL AND EXPERIMENTAL RESEARCH OF IN-VESSEL CORIUM RETENTION IN CPR1000
    Chen, Xing
    Zhang, Shishun
    Lin, Jiming
    Zhang, Huiyong
    PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING 2010, VOL 3, 2011, : 583 - 588
  • [25] Study and application of T3 periodical test solution for SEC system betterments of CPR1000 nuclear power plants
    Zhong, Bin
    Liu, Zhao-Yang
    He, Da-Yu
    Yang, Yang
    Yuanzineng Kexue Jishu/Atomic Energy Science and Technology, 2014, 48 : 873 - 876
  • [26] Optimization of Power Ramp Rate in CPR1000 Reactor Restarting
    Li C.
    Lin S.
    Liu W.
    Cai Z.
    Nie L.
    Deng Y.
    Hedongli Gongcheng/Nuclear Power Engineering, 2019, 40 (05): : 74 - 78
  • [27] Analysis of Fluctuation Characteristics of Power Range Detector for CPR1000
    He Y.
    Zhang H.
    Cao Y.
    Wang Z.
    Hedongli Gongcheng/Nuclear Power Engineering, 2019, 40 (06): : 30 - 34
  • [28] Vessel hydrostatic test duration analysis in prssurized water reactor nuclear power plant overhaul
    Zhang, Zhenguo
    FOURTH INTERNATIONAL CONFERENCE ON ENERGY ENGINEERING AND ENVIRONMENTAL PROTECTION, 2020, 467
  • [29] A Brief Analysis of AP1000 and CPR1000 Excore Nuclear Instrument System
    Xu S.
    Xie W.
    Xu H.
    Peng H.
    Wu Z.
    2018, Shanghai Jiaotong University (52): : 41 - 45
  • [30] Research on failure mechanism of CPR1000 containment vessel under internal pressure
    Yi P.
    Wang Q.
    Liu J.
    Liu, Jun (junliu@dlut.edu.cn), 1600, Editorial Board of Journal of Harbin Engineering (37): : 162 - 167