共 50 条
- [1] RADIOGRAPHY INSPECTION TECHNOLOGY OF CPR1000 NUCLEAR POWER UNIT PRESSURIZER [J]. ENERGY MATERIALS CONFERENCE PROCEEDINGS 2014, 2014, : 539 - 544
- [3] SAVING FUEL BY REGULAR STRETCH-OUT OPERATION [J]. ATOMWIRTSCHAFT-ATOMTECHNIK, 1978, 23 (02): : 83 - 85
- [4] MANAGEMENT AND PRACTICE OF CPR1000 NUCLEAR POWER PLANTS COMMISSIONING AND STARTUP [J]. PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING 2010, VOL 1, 2011, : 319 - 323
- [5] DYNAMIC BEHAVIOR OF RHEINSBERG NUCLEAR-POWER PLANT IN DIFFERENT OPERATION REGIMES DURING STRETCH-OUT OF BURNUP [J]. KERNENERGIE, 1972, 15 (08): : 269 - +
- [7] The scheme and implementation of vessel hydrostatic test in cpr1000 nuclear power plant [J]. THIRD INTERNATIONAL CONFERENCE ON ENERGY ENGINEERING AND ENVIRONMENTAL PROTECTION, 2019, 227
- [8] Union-Management Co-operation in the "Stretch-Out" [J]. AMERICAN ECONOMIC REVIEW, 1935, 25 (02): : 328 - 330
- [9] ECONOMIC STUDIES ON STRETCH-OUT OF BURNUP IN POWER REACTORS [J]. KERNENERGIE, 1971, 14 (03): : 73 - &
- [10] Extended low power operation justification of two typical first cycle for CPR1000 [J]. 1600, Atomic Energy Press (35):