The scheme and implementation of vessel hydrostatic test in cpr1000 nuclear power plant

被引:0
|
作者
Zhang, Zhenguo [1 ]
Feng, Huixing [1 ]
机构
[1] Suzhou Nucl Power Res Inst Co Ltd, Shenzhen 518124, Guangdong, Peoples R China
关键词
D O I
10.1088/1755-1315/227/2/022014
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Nuclear vessels hydrostatic test involves many important systems and key equipment in CPR1000 models nuclear power plant. This paper introduces how to make the nuclear vessel hydrostatic test scheme and the implementation of vessel hydrostatic test. The scheme of nuclear vessel hydrostatic test contains hydrostatic test plan scheduling, hydrostatic test Isolation Boundary, cutting and welding of hydrostatic test aspect, The implementation of nuclear vessel hydrostatic test contains instrument of hydrostatic test, working file of hydrostatic test, manpower arrangement of hydrostatic test, actual execution of hydrostatic test and technical difficulties of vessel hydrostatic test. This paper mainly discusses the scheme and implementation of nuclear vessel hydrostatic test.
引用
收藏
页数:4
相关论文
共 50 条
  • [1] Aseismic safety analysis of a prestressed concrete containment vessel for CPR1000 nuclear power plant
    Yi Ping
    Wang Qingkang
    Kong Xianjing
    EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION, 2017, 16 (01) : 55 - 67
  • [2] Aseismic safety analysis of a prestressed concrete containment vessel for CPR1000 nuclear power plant
    Ping Yi
    Qingkang Wang
    Xianjing Kong
    Earthquake Engineering and Engineering Vibration, 2017, 16 : 55 - 67
  • [3] Aseismic safety analysis of a prestressed concrete containment vessel for CPR1000 nuclear power plant
    Yi Ping
    Wang Qingkang
    Kong Xianjing
    Earthquake Engineering and Engineering Vibration, 2017, 16 (01) : 55 - 67
  • [4] Shaking table model tests of concrete containment Vessel (CCV) for CPR1000 nuclear power plant
    Liu, Jun
    Kong, Jianwei
    Kong, Xianjing
    PROGRESS IN NUCLEAR ENERGY, 2016, 93 : 186 - 204
  • [5] Improvement of ATWS protective signal and mitigation system for CPR1000 nuclear power plant
    China Nuclear Power Technology Research Institute, Shenzhen
    518026, China
    Yuanzineng Kexue Jishu, 10 (1811-1814):
  • [6] Estimation of the Uncertainties Surrounding Measurement of Vessel Water Level in CPR1000 Nuclear Power Plants
    Wang, Zhenying
    Jiao, Zhenying
    Yu, Fengwan
    BASIC & CLINICAL PHARMACOLOGY & TOXICOLOGY, 2020, 126 : 123 - 123
  • [7] Preliminary Study on Risk-informed LBLOCA of CPR1000 Nuclear Power Plant
    Song J.
    Yang J.
    Liu J.
    Liu P.
    Wang T.
    Liu Y.
    Yuanzineng Kexue Jishu/Atomic Energy Science and Technology, 2018, 52 (06): : 1028 - 1033
  • [8] Mechanical Shim core operational strategy designed for CPR1000 nuclear power plant
    Zhang, Y. W.
    Zeng, W. J.
    NUCLEAR ENGINEERING AND DESIGN, 2017, 322 : 14 - 26
  • [9] Implementation and Optimization Strategy of SG-CCTV Inspection of CPR1000 Nuclear Power Station
    Li, Tian
    Li, Cheng
    Chen, Yanhui
    Xue, Donglin
    2020 6TH INTERNATIONAL CONFERENCE ON ENERGY, ENVIRONMENT AND MATERIALS SCIENCE, 2020, 585
  • [10] Reactor core water level monitor system and startup for CPR1000 nuclear power plant
    Li, Xi-An
    Jin, Cheng-Yi
    Lu, Bai-Song
    Wang, Jiang-Hong
    Tan, Qi-An
    Zheng, Xin
    Yuanzineng Kexue Jishu/Atomic Energy Science and Technology, 2013, 47 (04): : 634 - 636