Mechanical Shim core operational strategy designed for CPR1000 nuclear power plant

被引:8
|
作者
Zhang, Y. W. [1 ]
Zeng, W. J. [2 ]
机构
[1] Xi An Jiao Tong Univ, Dept Nucl Sci & Technol, Xian 710049, Peoples R China
[2] Univ South China, Dept Nucl Sci & Technol, Hengyang City 421001, Peoples R China
关键词
CPR1000; MSHIM core control strategy; Load follow operation; Power control analysis method;
D O I
10.1016/j.nucengdes.2017.06.043
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The CPR1000, one of the water-cooled reactor types in China, employ MODE-G core control strategy through control rods and soluble boron to control the reactivity change during load follow operation, In spite of this, it has load follow capability for only 80% of cycle life, and also a large amount of radioactive waste liquid will be produced. In order to solve this problem, the MSHIM core control strategy was designed for CPR1000 in this paper. The MSHIM core control strategy has two independently moving RCCA groups are utilized for essentially simultaneous control of reactivity/temperature control and axial power distribution with complete boron-adjustment free load follow operation for up to more than 95% of cycle life. The prime objective of core control is to simultaneously manage core power level and power distribution to ensure the reactor operation safety. In the MSHIM core control strategy in CPR1000, reactor power control includes power level control and power distribution control. Power level control uses the reactivity balance analysis method; the objective of power distribution control is to ensure the safety related parameters, such as DNBRs and F-Q within its design limit, AO control analysis method is used. According to the reactivity balance analysis method, the control rods inserted in reactor core to offset the positive reactivity during load follow operation, and in CPR1000 core, part G1-bank is lifted to supply the positive reactivity prior to load follow operation. AO analysis result shows that the axial burnup distribution can affect the AO target value, AO control ability is enhanced with the increase of R-bank worth. Changing burnup history and redesigning the RCCAs are employed. (C) 2017 Elsevier B.V. All rights reserved.
引用
收藏
页码:14 / 26
页数:13
相关论文
共 50 条
  • [1] Modeling and load follow simulation of CPR1000 Nuclear Power Plant implementing Mechanical Shim control strategy
    Wu, Shifa
    Wang, Pengfei
    Song, Hongbing
    Wei, Xinyu
    Zhao, Fuyu
    Revankar, Shripad
    [J]. NUCLEAR ENGINEERING AND DESIGN, 2019, 352
  • [2] Transient Simulations of CPR1000 Nuclear Power Plant Implementing Advanced Mechanical Shim Control System
    Wu, Shifa
    Wan, Jiashuang
    Song, Hongbing
    Wei, Xinyu
    Zhao, Fuyu
    Revankar, Shripad
    [J]. NUCLEAR SCIENCE AND ENGINEERING, 2018, 192 (03) : 275 - 297
  • [3] Whole plant simulation study on load rejection transient of CPR1000 employing advanced Mechanical Shim strategy
    Wu, Shifa
    Yan, Xu
    Wei, Xinyu
    Zhao, Fuyu
    Revankar, Shripad
    [J]. ANNALS OF NUCLEAR ENERGY, 2020, 142
  • [4] The scheme and implementation of vessel hydrostatic test in cpr1000 nuclear power plant
    Zhang, Zhenguo
    Feng, Huixing
    [J]. THIRD INTERNATIONAL CONFERENCE ON ENERGY ENGINEERING AND ENVIRONMENTAL PROTECTION, 2019, 227
  • [5] Preliminary Study on Risk-informed LBLOCA of CPR1000 Nuclear Power Plant
    Song, Jianyang
    Yang, Jiang
    Liu, Jingquan
    Liu, Pingping
    Wang, Ting
    Liu, Yijun
    [J]. Yuanzineng Kexue Jishu/Atomic Energy Science and Technology, 2018, 52 (06): : 1028 - 1033
  • [6] Implementation and Optimization Strategy of SG-CCTV Inspection of CPR1000 Nuclear Power Station
    Li, Tian
    Li, Cheng
    Chen, Yanhui
    Xue, Donglin
    [J]. 2020 6TH INTERNATIONAL CONFERENCE ON ENERGY, ENVIRONMENT AND MATERIALS SCIENCE, 2020, 585
  • [7] Aseismic safety analysis of a prestressed concrete containment vessel for CPR1000 nuclear power plant
    Yi Ping
    Wang Qingkang
    Kong Xianjing
    [J]. EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION, 2017, 16 (01) : 55 - 67
  • [8] Aseismic safety analysis of a prestressed concrete containment vessel for CPR1000 nuclear power plant
    Ping Yi
    Qingkang Wang
    Xianjing Kong
    [J]. Earthquake Engineering and Engineering Vibration, 2017, 16 : 55 - 67
  • [9] Aseismic safety analysis of a prestressed concrete containment vessel for CPR1000 nuclear power plant
    Yi Ping
    Wang Qingkang
    Kong Xianjing
    [J]. Earthquake Engineering and Engineering Vibration, 2017, 16 (01) : 55 - 67
  • [10] A STUDY OF POWER DECREASE STRATEGY ON CPR1000 FULL SCOPE SIMULATOR
    Zhang, Zhenhua
    Zhang, Bo
    Wang, Qingsong
    Wang, Chengzhi
    Xing, Dan
    [J]. PROCEEDINGS OF THE 25TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING, 2017, VOL 1, 2017,