共 50 条
- [41] Study and Implementation on General Operating Procedure of CPR1000 Main Control Room in China NUCLEAR POWER PLANTS: INNOVATIVE TECHNOLOGIES FOR INSTRUMENTATION AND CONTROL SYSTEMS (ISNPP 2019), 2020, 595 : 90 - 100
- [42] Precise prefabrication of primary pipes automatic welding in CPR1000 nuclear island installation Hedongli Gongcheng/Nuclear Power Engineering, 2013, 34 (06): : 121 - 124
- [43] Extended low power operation justification of two typical first cycle for CPR1000 1600, Atomic Energy Press (35):
- [44] The Important Reference Factors of Nuclear Vessel Hydrostatic Test PROCEEDINGS OF THE 2ND ANNUAL INTERNATIONAL CONFERENCE ON ADVANCED MATERIAL ENGINEERING (AME 2016), 2016, 85 : 1321 - 1324
- [45] THERMAL STRESS AND DEFORMATION ANALYSIS OF HP CASING DURING SHUTDOWN OF CPR1000 NUCLEAR STEAM TURBINE PROCEEDINGS OF THE ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2017, VOL 8, 2017,
- [46] Aseismic safety analysis of a containment vessel model for CNP1000 nuclear power plant Gongcheng Lixue/Engineering Mechanics, 2009, 26 (04): : 153 - 157
- [48] Research of T3 test valve stroke time measurement design realization for new CPR1000 project Wang, Qiao-Yan, 1600, Atomic Energy Press (48):
- [49] ESTIMATION OF EX-VESSEL STEAM EXPLOSION PRESSURE LOADS FOR AP1000 NUCLEAR POWER PLANT PROCEEDINGS OF THE 22ND INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2014, VOL 3, 2014,
- [50] Repeated Pressure Test of Containment Vessel in the Lingen, West Germany, Nuclear Power Plant. VGB Kraftwerkstechnik, 1974, 54 (12): : 810 - 816