The scheme and implementation of vessel hydrostatic test in cpr1000 nuclear power plant

被引:0
|
作者
Zhang, Zhenguo [1 ]
Feng, Huixing [1 ]
机构
[1] Suzhou Nucl Power Res Inst Co Ltd, Shenzhen 518124, Guangdong, Peoples R China
关键词
D O I
10.1088/1755-1315/227/2/022014
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Nuclear vessels hydrostatic test involves many important systems and key equipment in CPR1000 models nuclear power plant. This paper introduces how to make the nuclear vessel hydrostatic test scheme and the implementation of vessel hydrostatic test. The scheme of nuclear vessel hydrostatic test contains hydrostatic test plan scheduling, hydrostatic test Isolation Boundary, cutting and welding of hydrostatic test aspect, The implementation of nuclear vessel hydrostatic test contains instrument of hydrostatic test, working file of hydrostatic test, manpower arrangement of hydrostatic test, actual execution of hydrostatic test and technical difficulties of vessel hydrostatic test. This paper mainly discusses the scheme and implementation of nuclear vessel hydrostatic test.
引用
收藏
页数:4
相关论文
共 50 条
  • [41] Study and Implementation on General Operating Procedure of CPR1000 Main Control Room in China
    Shi, Ji
    Huang, Qing-Wu
    Zhou, Chuang-Bin
    Xu, Liang-Jun
    Jiang, Hui
    NUCLEAR POWER PLANTS: INNOVATIVE TECHNOLOGIES FOR INSTRUMENTATION AND CONTROL SYSTEMS (ISNPP 2019), 2020, 595 : 90 - 100
  • [42] Precise prefabrication of primary pipes automatic welding in CPR1000 nuclear island installation
    Zhang, Ke
    Li, Jia-Bin
    Wang, Dong
    Hedongli Gongcheng/Nuclear Power Engineering, 2013, 34 (06): : 121 - 124
  • [44] The Important Reference Factors of Nuclear Vessel Hydrostatic Test
    Zhang, Zhen-Guo
    PROCEEDINGS OF THE 2ND ANNUAL INTERNATIONAL CONFERENCE ON ADVANCED MATERIAL ENGINEERING (AME 2016), 2016, 85 : 1321 - 1324
  • [45] THERMAL STRESS AND DEFORMATION ANALYSIS OF HP CASING DURING SHUTDOWN OF CPR1000 NUCLEAR STEAM TURBINE
    Guo, Yanan
    Xie, Danmei
    PROCEEDINGS OF THE ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2017, VOL 8, 2017,
  • [46] Aseismic safety analysis of a containment vessel model for CNP1000 nuclear power plant
    Duan, An
    Qian, Jia-Ru
    Gongcheng Lixue/Engineering Mechanics, 2009, 26 (04): : 153 - 157
  • [47] Whole plant simulation study on load rejection transient of CPR1000 employing advanced Mechanical Shim strategy
    Wu, Shifa
    Yan, Xu
    Wei, Xinyu
    Zhao, Fuyu
    Revankar, Shripad
    ANNALS OF NUCLEAR ENERGY, 2020, 142
  • [49] ESTIMATION OF EX-VESSEL STEAM EXPLOSION PRESSURE LOADS FOR AP1000 NUCLEAR POWER PLANT
    Li, Zhigang
    Li, Jinghao
    Lin, Meng
    Yang, Yanhua
    PROCEEDINGS OF THE 22ND INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2014, VOL 3, 2014,
  • [50] Repeated Pressure Test of Containment Vessel in the Lingen, West Germany, Nuclear Power Plant.
    Beyer, H.
    VGB Kraftwerkstechnik, 1974, 54 (12): : 810 - 816