Nuclear power plants commissioning is an entire inspection and verification process of systems and equipments carried out by commissioning party, to prove that the overall performance of system, equipment and unit can meet the design requirements, operation criteria and nuclear safety criteria, and the plant is qualified for long-term stable and safe operation. As commissioning work has the characteristic of long lasting time, broad scope, high technology and lots of interfaces, and so on, it must be carried out under a set of scientific management system, to accord with requirements of "six controls" of commissioning work. The text aims at researching and investigating into commissioning management system that is in accordance with CPR1000 nuclear power plant commissioning through analysis of constitutes and practice situation of Ling AO phase II project commissioning management system, so as to instruct and standardize the commissioning management of nuclear power plants.
引用
收藏
页码:319 / 323
页数:5
相关论文
共 50 条
  • [1] Estimation of the Uncertainties Surrounding Measurement of Vessel Water Level in CPR1000 Nuclear Power Plants
    Wang, Zhenying
    Jiao, Zhenying
    Yu, Fengwan
    [J]. BASIC & CLINICAL PHARMACOLOGY & TOXICOLOGY, 2020, 126 : 123 - 123
  • [2] STUDY ON MODIFICATIONS OF CPR1000 NUCLEAR PLANTS FOR DESIGN EXTENSION CONDITIONS
    Hui, Tang
    Gong, Ai-Cheng
    Feng, Zhu
    [J]. PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2013, VOL 1, 2014,
  • [3] RADIOGRAPHY INSPECTION TECHNOLOGY OF CPR1000 NUCLEAR POWER UNIT PRESSURIZER
    Hao, Jingyun
    Deng, Dong
    Wang, Jing
    Wang, Shuangyin
    Hua, Xiongfei
    [J]. ENERGY MATERIALS CONFERENCE PROCEEDINGS 2014, 2014, : 539 - 544
  • [4] The scheme and implementation of vessel hydrostatic test in cpr1000 nuclear power plant
    Zhang, Zhenguo
    Feng, Huixing
    [J]. THIRD INTERNATIONAL CONFERENCE ON ENERGY ENGINEERING AND ENVIRONMENTAL PROTECTION, 2019, 227
  • [5] Research of the disturbances to reactor vessel water level measurement due to physical phenomena in CPR1000 nuclear power plants
    Wang Zhenying
    Li Runsheng
    Sun Kaibao
    Ma Tingwei
    Sun Chen
    [J]. INTERNATIONAL YOUTH NUCLEAR CONGRESS 2016, IYNC2016, 2017, 127 : 60 - 67
  • [6] Mechanical Shim core operational strategy designed for CPR1000 nuclear power plant
    Zhang, Y. W.
    Zeng, W. J.
    [J]. NUCLEAR ENGINEERING AND DESIGN, 2017, 322 : 14 - 26
  • [7] Optimal Control of Stretch-out Operation for CPR1000 Nuclear Power Unit
    Yang, Zhang
    Song, Yinlei
    Tian, Wei
    [J]. Hedongli Gongcheng/Nuclear Power Engineering, 2022, 43 (03): : 144 - 150
  • [8] Preliminary Study on Risk-informed LBLOCA of CPR1000 Nuclear Power Plant
    Song, Jianyang
    Yang, Jiang
    Liu, Jingquan
    Liu, Pingping
    Wang, Ting
    Liu, Yijun
    [J]. Yuanzineng Kexue Jishu/Atomic Energy Science and Technology, 2018, 52 (06): : 1028 - 1033
  • [9] Research on experiment evaluation method for thermal ratchet of nuclear equipment at CPR1000 nuclear power station
    Wu, Shijian
    Jing, Ting
    Xiong, Guangming
    Liu, Le
    [J]. Hedongli Gongcheng/Nuclear Power Engineering, 2014, 35 (05): : 94 - 96
  • [10] CANADIAN PRACTICE IN COMMISSIONING OF NUCLEAR-POWER-PLANTS
    LAWSON, DS
    JACKSON, HA
    [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1985, 49 : 131 - 138