Preferences of Construction Managers Regarding the Quality and Optimization Criteria of Project Schedules

被引:6
|
作者
Tomczak, Michal [1 ]
Jaskowski, Piotr [1 ]
机构
[1] Lublin Univ Technol, Fac Civil Engn & Architecture, 40 Nadbystrzycka St, PL-20618 Lublin, Poland
关键词
construction scheduling; construction project management; factor analysis; multiple objective; schedule criteria; survey research;
D O I
10.3390/su13020544
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In the literature on the scheduling of construction projects it is difficult to find a justification for adopting the criteria for evaluating work schedules based explicitly on the preferences of those who develop them. This article tries to fill this gap and provide information on the preferences of construction site managers for sustainable scheduling and organization of construction projects. The publication focuses on the views and needs of construction site engineering staff regarding methods of work organization, the need to reduce downtimes in the work of crews, the deadline for project realization and the selection of crews for tasks. This information was obtained on the basis of surveys conducted among managerial staff of various levels (74 people). The authors hope that the information provided in this publication will allow the creation of more reliable tools to support construction managers better adapted to their preferences and needs, and therefore more likely to be applied in practice.
引用
收藏
页码:1 / 24
页数:22
相关论文
共 50 条
  • [41] An Research of the Construction Project Managers's Moral Qualities
    Cui, Chenhua
    [J]. PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON MECHATRONICS, ELECTRONIC, INDUSTRIAL AND CONTROL ENGINEERING, 2015, 8 : 1663 - 1667
  • [42] Analysis to optimal portfolio of the incentives to construction project managers
    Zhao Shide
    Tian Jinxin
    Deng Hongwei
    [J]. Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 562 - 564
  • [43] Project Managers' Competencies Model for Construction Industry in Poland
    Dziekonski, Krzysztof
    [J]. 7TH INTERNATIONAL CONFERENCE ON ENGINEERING, PROJECT, AND PRODUCTION MANAGEMENT, 2017, 182 : 174 - 181
  • [44] EVOLUTIONARY OPTIMIZATION OF RESOURCE ALLOCATION IN REPETITIVE CONSTRUCTION SCHEDULES
    Nassar, Khaled
    [J]. JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2005, 10 : 265 - 273
  • [45] Project Management Metamodel Construction Regarding IT Departments
    Hamzane, Ibrahim
    Abdessamad, Belangour
    [J]. INTERNATIONAL JOURNAL OF ADVANCED COMPUTER SCIENCE AND APPLICATIONS, 2019, 10 (10) : 208 - 212
  • [46] IT project managers' construction of successful project management practice: a repertory grid investigation
    Napier, Nannette P.
    Keil, Mark
    Tan, Felix B.
    [J]. INFORMATION SYSTEMS JOURNAL, 2009, 19 (03) : 255 - 282
  • [47] The Impact of Managers Selection Criteria on Quality of Capabilities: Are Managers only for Representative Function?
    Rungi, Mait
    [J]. 2013 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM 2013), 2013, : 1646 - 1650
  • [48] Valuation of Project Managers to Enhance Project Performance in Nigeria’s Construction Industry
    Iroha, Ebuka Valentine
    Watanabe, Tsunemi
    Tsuchiya, Satoshi
    [J]. Buildings, 14 (09):
  • [49] Dilbert Moments: Exploring the Factors Impacting Upon the Accuracy of Project Managers' Baseline Schedules
    Prater, James
    Kirytopoulos, Konstantinos
    Ma, Tony
    [J]. INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2019, 10 (02) : 29 - 40
  • [50] Quality Reliability-Cost Optimization of Construction Project based on Genetic Algorithm
    Shi Yu-fang
    Li Hui-min
    Lu Ning
    [J]. 2009 INTERNATIONAL CONFERENCE ON ENGINEERING COMPUTATION, 2009, : 159 - +