An Research of the Construction Project Managers's Moral Qualities

被引:0
|
作者
Cui, Chenhua [1 ]
机构
[1] Xianyang Vocat & Tech Coll, Xianyang, Peoples R China
关键词
construction project manager; political qualities; ideological qualities; personal character qualities; professional moral qualities;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In view of non-standard question of the current construction project managers's "moral" qualities structure, On the one hand, investigated. studied and analyzed domestic and foreign construction project managers's "moral" qualities structure present situation, referred to the domestic and foreign existing qualities structure model; At the same time actively into a line of construction site. construction manager projects department. construction related industry sectors, Communicated in different degrees With all kinds of people. all kinds of roles. By contrast. abstraction and summary created a construction enterprise project managers's "moral" qualities structure framework; By means of questionnaires and other means, built out of the importance of each kind of qualities element for project success; At last, the feasibility of the scheme was verified by practical application.
引用
收藏
页码:1663 / 1667
页数:5
相关论文
共 50 条
  • [1] A Research of the Construction Project Managers' Moral Qualities
    Cui Chenhua
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON LOGISTICS, ENGINEERING, MANAGEMENT AND COMPUTER SCIENCE (LEMCS 2015), 2015, 117 : 133 - 137
  • [2] A Study on Construction Project Managers' Temperament Qualities
    Cui, Chenhua
    [J]. PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON SOCIAL NETWORK, COMMUNICATION AND EDUCATION (SNCE 2016), 2016, 77 : 213 - 217
  • [3] Game analysis on moral hazard of construction project managers in China
    Ma, L.
    Zhang, P.
    [J]. INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2014, 12 (4A) : 429 - 438
  • [4] Approaches to construction project managers
    Radujkovic, Mladen
    Vukomanovic, Mladen
    Bezak, Stjepan
    [J]. GRADEVINAR, 2010, 62 (07): : 621 - 631
  • [5] Valuation of Project Managers to Enhance Project Performance in Nigeria’s Construction Industry
    Iroha, Ebuka Valentine
    Watanabe, Tsunemi
    Tsuchiya, Satoshi
    [J]. Buildings, 14 (09):
  • [6] Research on preventing moral hazard of construction project based on information asymmetries
    Xiang, Pengcheng
    Wang, Jinan
    [J]. Open Construction and Building Technology Journal, 2014, 8 (01): : 468 - 475
  • [7] Research on preventing moral hazard of construction project based on information asymmetries
    Faculty of Construction Management and Real Estate, Chongqing University, China
    不详
    [J]. Open Construct. Build. Technol. J., (468-475):
  • [8] The research of project managers' competence
    Liu, ML
    Zhang, ZG
    [J]. PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS 1 AND 2, 2004, : 2674 - 2678
  • [9] A literature review on leadership qualities among Project Managers of building refurbishment
    Garces, G.
    [J]. REVISTA INGENIERIA DE CONSTRUCCION, 2020, 35 (01): : 45 - 59
  • [10] Effects of construction project managers' goal orientation on project performance
    Zhang, Qi
    Hao, Shengyue
    Guo, Jienan
    Tang, Boju
    [J]. SOCIAL BEHAVIOR AND PERSONALITY, 2022, 50 (06):