共 50 条
- [1] The balanced optimization of the project quality schedule and cost based on Genetic Algorithm [J]. PROCEEDINGS OF THE 2015 4TH INTERNATIONAL CONFERENCE ON SENSORS, MEASUREMENT AND INTELLIGENT MATERIALS, 2016, 43 : 1204 - 1208
- [2] Research on Integrated Optimization of Time-cost-quality of Engineering Project Based on Genetic Algorithm [J]. CONFERENCE PROCEEDINGS OF THE 6TH INTERNATIONAL SYMPOSIUM ON PROJECT MANAGEMENT (ISPM2018), 2018, : 1300 - 1304
- [3] Construction Project Quality Cost Optimization Design [J]. EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 2054 - 2057
- [5] UNIT COMMITMENT COST AND RELIABILITY OPTIMIZATION BASED ON AN IMPROVED GENETIC ALGORITHM [J]. REVUE ROUMAINE DES SCIENCES TECHNIQUES-SERIE ELECTROTECHNIQUE ET ENERGETIQUE, 2014, 59 (01): : 25 - 33
- [6] Network Comprehensive Optimization for Schedule and Cost in Project Construction Based on PSO Algorithm [J]. 2008 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS, VOLS 1-6, 2008, : 1260 - 1264
- [7] Ti time-cost-quality tradeoff optimization in construction project based on modified ant colony algorithm [J]. PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2008, : 1031 - 1035
- [8] Application of Time-Cost-Quality Tradeoff Optimization Model Based on Improved PSO Algorithm to Construction Project [J]. 2009 ASIA-PACIFIC CONFERENCE ON INFORMATION PROCESSING (APCIP 2009), VOL 2, PROCEEDINGS, 2009, : 298 - 301
- [9] Integrated management and optimization of construction project schedule, cost and quality [J]. 2018 INTERNATIONAL WORKSHOP ON ADVANCES IN SOCIAL SCIENCES (IWASS 2018), 2019, : 622 - 625