共 50 条
- [2] Application of Time-Cost-Quality Tradeoff Optimization Model Based on Improved PSO Algorithm to Construction Project [J]. 2009 ASIA-PACIFIC CONFERENCE ON INFORMATION PROCESSING (APCIP 2009), VOL 2, PROCEEDINGS, 2009, : 298 - 301
- [3] Ti time-cost-quality tradeoff optimization in construction project based on modified ant colony algorithm [J]. PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2008, : 1031 - 1035
- [4] Fuzzy tradeoff optimization of time-cost-quality in construction project [J]. Xitong Gongcheng Lilum yu Shijian, 2006, 7 (112-117):
- [5] Multi-objective optimization of time-cost-quality in construction projects using genetic algorithm [J]. REVISTA DE LA CONSTRUCCION, 2020, 19 (03): : 335 - 346
- [6] Time-Cost-Quality Risk Elements Transmission Equilibrium Optimization of Wind Power Project Based on SAPSO [J]. 2014 INTERNATIONAL CONFERENCE ON ECONOMICS AND MANAGEMENT, 2014, : 669 - 673
- [7] The balanced optimization of the project quality schedule and cost based on Genetic Algorithm [J]. PROCEEDINGS OF THE 2015 4TH INTERNATIONAL CONFERENCE ON SENSORS, MEASUREMENT AND INTELLIGENT MATERIALS, 2016, 43 : 1204 - 1208
- [9] Research on Engineering Project Time-cost Optimization Based on Particle Swarm Optimization [J]. RECENT TRENDS IN MATERIALS AND MECHANICAL ENGINEERING MATERIALS, MECHATRONICS AND AUTOMATION, PTS 1-3, 2011, 55-57 : 1683 - 1686
- [10] Quality Reliability-Cost Optimization of Construction Project based on Genetic Algorithm [J]. 2009 INTERNATIONAL CONFERENCE ON ENGINEERING COMPUTATION, 2009, : 159 - +