Time-Cost-Quality Risk Elements Transmission Equilibrium Optimization of Wind Power Project Based on SAPSO

被引:0
|
作者
Liu, Jicheng [1 ]
Chang, Hao [1 ]
Wang, Suhua [2 ]
机构
[1] North China Elect Power Univ, Sch Econ & Management, Beijing, Peoples R China
[2] Dept Planning Data Sanmenxia Power Generat Co Ltd, Sanmenxia 472143, Peoples R China
关键词
wind power project; time-cost-quality; risk elements transmission; equilibrium optimization; SAPSO; DISCRETE-TIME;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
Wind power project time-cost-quality risk and the risk transmission is the key to wind power project risk management. Based on the analysis of time-cost-quality risk characteristics in the capital construction period of wind power project, this paper establishes a time-cost-quality risk elements transmission equilibrium optimization model for wind power project, determines the decision variables and objective function, taking a wind power project as an example, calculating the critical path and the time limit through the analysis of the construction network program, compiling simulated annealing-particle swarm program in MATLAB to solve the model and obtain the Pareto solution, and generating three-dimensional Pareto Figures. It not only verifies the feasibility of the optimization model, and also provides effective decision-making basis for wind power project managers.
引用
收藏
页码:669 / 673
页数:5
相关论文
共 50 条
  • [1] Research on Optimization of Project Time-Cost-Quality Based on Particle Swarm Optimization
    Song, Yanqing
    Hou, Genran
    [J]. INTERNATIONAL JOURNAL OF INFORMATION SYSTEMS AND SUPPLY CHAIN MANAGEMENT, 2019, 12 (02) : 76 - 88
  • [2] Fuzzy tradeoff optimization of time-cost-quality in construction project
    Management School, Xi'an Jiaotong University, Xi'an 710049, China
    [J]. Xitong Gongcheng Lilum yu Shijian, 2006, 7 (112-117):
  • [3] Research on Integrated Optimization of Time-cost-quality of Engineering Project Based on Genetic Algorithm
    Liu, Qiang
    Yang, Chunyan
    [J]. CONFERENCE PROCEEDINGS OF THE 6TH INTERNATIONAL SYMPOSIUM ON PROJECT MANAGEMENT (ISPM2018), 2018, : 1300 - 1304
  • [4] Application of Time-Cost-Quality Tradeoff Optimization Model Based on Improved PSO Algorithm to Construction Project
    Yang, Qin
    [J]. 2009 ASIA-PACIFIC CONFERENCE ON INFORMATION PROCESSING (APCIP 2009), VOL 2, PROCEEDINGS, 2009, : 298 - 301
  • [5] Ti time-cost-quality tradeoff optimization in construction project based on modified ant colony algorithm
    Huang, Yuan-Sheng
    Deng, Jia-Jia
    Zang, Yun-Yun
    [J]. PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2008, : 1031 - 1035
  • [6] Study on trade-off of time-cost-quality in construction project based on BIM
    Xu Yongge
    Wei Ya
    [J]. PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING, 2015, 38 : 864 - 870
  • [7] A New Approach to Time-Cost-Quality Tradeoff Problem for Construction Project
    Fu Fang
    Zhang Chao
    [J]. 2014 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (ICMSE), 2014, : 1836 - 1842
  • [8] An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation
    Hu, Wenfa
    He, Xinhua
    [J]. SCIENTIFIC WORLD JOURNAL, 2014,
  • [9] A Stochastic Time-cost-quality Tradeoff Model for Discrete Project Scheduling Problem
    Ma, Wei-Min
    Liu, Qing-Hai
    Ke, Hua
    [J]. PROCEEDINGS OF THE 2014 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND MANAGEMENT INNOVATION, 2014, : 318 - 323
  • [10] Multi-objective Stochastic Time-cost-quality Optimization for Construction Projects Based on the Reliability Theory
    Wang, Jingjing
    Wang, Zongxi
    Liu, Huimin
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2023, 27 (11) : 4545 - 4556