Modelling and scheduling multi-objective flow shop problems with interfering jobs

被引:13
|
作者
Torkashvand, M. [1 ]
Naderi, B. [1 ]
Hosseini, S. A. [1 ]
机构
[1] Kharazmi Univ, Dept Ind Engn, Fac Engn, Tehran, Iran
关键词
Multi-objective flow shop scheduling; Interfering job sets; Biogeography-based optimization; BIOGEOGRAPHY-BASED OPTIMIZATION; SINGLE-MACHINE; METAHEURISTICS; MINIMIZE;
D O I
10.1016/j.asoc.2016.12.041
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper studies multi-objective flow shop scheduling problems with interfering jobs. That is, there are two sets of jobs and each of which has its own objective. Some jobs are scheduled so as to minimize makespan while the others are to minimize total tardiness. In this case, the problem was mathematically modeled by a mixed integer linear program. Then, a novel biogeography-based optimization was developed to solve the problem. To evaluate the algorithm, its performance was compared with three well-known algorithms in the literature. The results of the present study show that the proposed algorithm outperforms the other tested algorithms. (C) 2017 Elsevier B.V. All rights reserved.
引用
收藏
页码:221 / 228
页数:8
相关论文
共 50 条
  • [21] Multi-objective flow shop scheduling using hybrid simulated annealing
    Dhingra, Ashwani
    Chandna, Pankaj
    MEASURING BUSINESS EXCELLENCE, 2010, 14 (03) : 30 - 41
  • [22] A simulated annealing algorithm for multi-objective hybrid flow shop scheduling
    Ma, Shu-Mei
    Sun, Yun
    Li, Ai-Ping
    DESIGN, MANUFACTURING AND MECHATRONICS (ICDMM 2015), 2016, : 1463 - 1473
  • [23] Study on No-Wait Flexible Flow Shop Scheduling with Multi-objective
    Tao, Ze
    Liu, Xiaoxia
    INTELLIGENT ROBOTICS AND APPLICATIONS, ICIRA 2019, PART VI, 2019, 11745 : 457 - 468
  • [24] Multi-objective Scheduling for Parallel Jobs on Grid
    Liu, Pengfei
    Dong, Shoubin
    ADVANCED MEASUREMENT AND TEST, PARTS 1 AND 2, 2010, 439-440 : 1281 - +
  • [25] A multi-objective discrete invasive weed optimization for multi-objective blocking flow-shop scheduling problem
    Shao, Zhongshi
    Pi, Dechang
    Shao, Weishi
    EXPERT SYSTEMS WITH APPLICATIONS, 2018, 113 : 77 - 99
  • [26] A novel multi-objective particle swarm optimization algorithm for no-wait flow shop scheduling problems
    Pan, Q-K
    Wang, L.
    Qian, B.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2008, 222 (04) : 519 - 539
  • [27] Efficient multi-objective optimization algorithm for hybrid flow shop scheduling problems with setup energy consumptions
    Li, Jun-qing
    Sang, Hong-yan
    Han, Yu-yan
    Wang, Cun-gang
    Gao, Kai-zhou
    JOURNAL OF CLEANER PRODUCTION, 2018, 181 : 584 - 598
  • [28] Hybrid Approach for Solving Multi-Objective Hybrid Flow Shop Scheduling Problems with Family Setup Times
    Nahhas, Abdulrahman
    Kharitonov, Andrey
    Alwadi, Ahmad
    Turowski, Klaus
    3RD INTERNATIONAL CONFERENCE ON INDUSTRY 4.0 AND SMART MANUFACTURING, 2022, 200 : 1685 - 1694
  • [29] An efficient search method for multi-objective flexible job shop scheduling problems
    Xing, Li-Ning
    Chen, Ying-Wu
    Yang, Ke-Wei
    JOURNAL OF INTELLIGENT MANUFACTURING, 2009, 20 (03) : 283 - 293
  • [30] A multi-objective fuzzy genetic algorithm for job-shop scheduling problems
    Xing, Y. J.
    Wang, Z. Q.
    Sun, J.
    Meng, J. J.
    2006 INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND SECURITY, PTS 1 AND 2, PROCEEDINGS, 2006, : 398 - 401