Research in the field of project maturity in construction companies

被引:1
|
作者
Klaus-Rosinska, Agata [1 ]
Iwko, Joanna [1 ]
机构
[1] Wroclaw Univ Sci & Technol, Dept Management Syst & Org Dev, Wroclaw, Poland
关键词
Project maturity assessment; project maturity model; construction projects; qualitative research; fuzzy numbers;
D O I
10.1080/12460125.2020.1862987
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
The article examines the problem of project maturity in construction companies. In general usage, 'maturity' means fully developed or perfected and is used in the term 'maturity model', that occur in various branches of the economy. The research problem is the answer to the question: how qualitative research strategy can be applied to assess project maturity in construction companies? The article aims to examine scientific knowledge about maturity in project management and against this background to propose model which will be used in project maturity assessment for construction companies. The research methods used in the study include critical analysis of the subject literature and logical reasoning. In the future, results of this research may be used in a decision support system (DSS) in the area of project management in construction companies.
引用
收藏
页码:361 / 374
页数:14
相关论文
共 50 条
  • [11] MARKET RESEARCH TO IMPROVE USE OF PROJECT MANAGEMENT IN CONSTRUCTION COMPANIES IN ROMANIA
    Negrut, M. L.
    Alan, P.
    Mihartescu, A. A.
    [J]. MANAGEMENT OF TECHNOLOGICAL CHANGES, BOOK 1, 2011, : 585 - 588
  • [12] Important Cautions Research about Chinese-Funded Construction Companies Bidding on Omani Construction Project
    Yan, Linjun
    [J]. 2014 SEVENTH INTERNATIONAL JOINT CONFERENCE ON COMPUTATIONAL SCIENCES AND OPTIMIZATION (CSO), 2014, : 492 - 496
  • [13] A Research on the Project Management Maturity Evaluation of College's Excellent Course Construction Team
    Wu Wenchuan
    [J]. PROCEEDINGS OF THE 6TH EURO-ASIA CONFERENCE ON ENVIRONMENT AND CSR: SOCIETY AND TOURISM MANAGEMENT SESSION, PT II, 2010, : 32 - 39
  • [14] Study of construction project management maturity model
    Liqun, Liu
    Yuhua, An
    [J]. PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2007, : 355 - 360
  • [15] Project Management Maturity Models for Construction Firms
    Machado, Filipe
    Duarte, Nelson
    Amaral, Antonio
    Barros, Teresa
    [J]. JOURNAL OF RISK AND FINANCIAL MANAGEMENT, 2021, 14 (12)
  • [16] Project Management Maturity and Strategic Entrepreneurship in Financial Industry Companies
    Julio, Luciana Reis
    Piscopo, Marcos Roberto
    [J]. REVISTA GESTAO & TECNOLOGIA-JOURNAL OF MANAGEMENT AND TECHNOLOGY, 2013, 13 (03): : 178 - 208
  • [17] PROJECT MANAGEMENT MATURITY IN COMPANIES OPERATING ON POLISH LOGISTICS MARKET
    Ogonowski, Piotr
    Madzinski, Maciej
    [J]. LOGFORUM, 2019, 15 (02) : 223 - 235
  • [18] A Maturity Model for Resilient Safety Culture Development in Construction Companies
    Minh Tri Trinh
    Feng, Yingbin
    [J]. BUILDINGS, 2022, 12 (06)
  • [19] Measuring and Benchmarking the Quality Culture Maturity of Construction Companies in Indonesia
    Karim, R.A.
    Latief, Y.
    Zagloel, T.Y.
    [J]. International Journal of Engineering, Transactions A: Basics, 2022, 35 (10): : 2028 - 2039
  • [20] Conjoint utility analysis of technical maturity and project progress of construction project
    Ma, Wei
    [J]. 2016 INTERNATIONAL CONFERENCE ON MECHATRONICS, MANUFACTURING AND MATERIALS ENGINEERING (MMME 2016), 2016, 63