共 50 条
- [41] Adjustment mechanism of the typical sandbars in the lower Jingjiang River after the impoundment of the Three Gorges Reservoir Hupo Kexue/Journal of Lake Sciences, 2021, 33 (03): : 819 - 829
- [42] Features and causes of sediment deposition and erosion in Jingjiang reach after impoundment of the Three Gorges Project Sun, Z.-H. (Lnszh@126.com), 1600, International Research and Training Center on Erosion and Sedimentation and China Water and Power Press (45):
- [43] Channel evolution of Jingjiang reach and its influences on waterway after impoundment of the Three Gorges Project Yingyong Jichu yu Gongcheng Kexue Xuebao/Journal of Basic Science and Engineering, 2010, 18 (01): : 1 - 10
- [45] Sediment transportation in the Yangtze River and impacts of the three gorges project RIVER FLOW 2006, VOLS 1 AND 2, 2006, : 61 - +
- [48] Main technical problems in the river closure of the Three Gorges project Huaxue Jiancai/Chemical Materials for Construction, 1998, 14 (01): : 14 - 16
- [49] Summarization on geologic research of Three Gorges Project of the Yangtze River Renmin Changjiang/Yangtze River, 2003, 34 (08):
- [50] Rainfall soil erosion and drainage channel silting up on the plain along the downstream of the Yellow River Land and Water Management: Decision Tools and Practices, Vols 1 and 2, 2004, : 682 - 686