共 50 条
- [21] Temporal and spatial distribution of bank retreat in the Jingjiang reach of the Yangtze River after the Three Gorges Project operation and its influence on channel adjustment Hupo Kexue/Journal of Lake Sciences, 2022, 34 (01): : 296 - 306
- [23] River closure technique of the Three Gorges Project Zhongguo Kexue Jishu Kexue/Scientia Sinica Technologica, 2017, 47 (08): : 785 - 795
- [26] Mechanism of adjustment of scouring and silting of Chenglingji-Jiujiang reach in the middle reaches of the Yangtze River after impoundment of the Three Gorges Dam Shuikexue Jinzhan/Advances in Water Science, 2020, 31 (02): : 162 - 171
- [27] Risk assessment for closure of the diversion channel at the Three Gorges Project in the Yangtze River IAHS-AISH Publication, 2003, (281): : 99 - 106
- [28] Risk assessment for closure of the diversion channel at the Three Gorges Project on the Yangtze River WATER RESOURCES SYSTEMS-HYDROLOGICAL RISK, MANAGEMENT AND DEVELOPMENT, 2003, (281): : 99 - 106
- [29] Downstream Yangtze River levels impacted by Three Gorges Dam ENVIRONMENTAL RESEARCH LETTERS, 2013, 8 (04):
- [30] Study on scouring and methods in the downstream of Three Gorges Reservoir 2017 INTERNATIONAL CONFERENCE ON SMART CITY AND SYSTEMS ENGINEERING (ICSCSE 2017), 2017, : 136 - 140