Construction Projects Priority Selection of Trading Patterns based on Transaction Cost

被引:0
|
作者
Jiang Xin [1 ]
Zhang Wei [2 ]
Wei Xiongwei [1 ]
Peng Zhenli [1 ]
机构
[1] China Three Gorges Univ, Coll Hydraul & Environm Engn, Yichang, Peoples R China
[2] Beijing Urban Construct Grp, Beijing, Peoples R China
关键词
Construction Projects; Transaction Mode; Transaction Costs;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
Transaction costs are ignored in the course of trading pattern selection of construction projects. Based on transaction cost theory, several common transaction models in construction projects such as EPC, DBB, CM, PM, BOT, and Construction Agents are chosen to analyze the main factors affecting their transaction costs. AHP is applied to quantify those factors into semi-quantitative analysis, through matrix operations to determine the priority order for those transaction models, and to provide a certain basis for the selection of construction project trading patterns. On this basis, and combined with the actual construction project case studies, ideas and suggestions are put forward for reducing transaction costs and countermeasures.
引用
收藏
页码:73 / 82
页数:10
相关论文
共 50 条
  • [41] Method of selection construction projects based on FANP model and its application
    Zhou, Xiao-Guang
    Gao, Xue-Dong
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2012, 32 (11): : 2459 - 2466
  • [42] Competency-based selection and assignment of human resources to construction projects
    Shahhosseini, V.
    Sebt, M. H.
    SCIENTIA IRANICA, 2011, 18 (02) : 163 - 180
  • [43] Using the ordinal priority approach for selecting the contractor in construction projects
    Alkaabi, Sajjad Ali Mahmood
    Mahjoob, Ahmed Mohammed Raoof
    ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2023, 15 (01): : 136 - 156
  • [44] Cost Based Value Stream Mapping as a Sustainable Construction Tool for Undergraound Pipeline Construction Projects
    Gunduz, Murat
    Naser, Ayman Fahmi
    SUSTAINABILITY, 2017, 9 (12)
  • [45] DEMAND FOR BROKERS SERVICES - RELATION BETWEEN SECURITY TRADING VOLUME AND TRANSACTION COST
    EPPS, TW
    BELL JOURNAL OF ECONOMICS, 1976, 7 (01): : 163 - 194
  • [46] Cost Contingency and Cost Evolvement of Construction Projects in the Preconstruction Phase
    Hoseini, Erfan
    Bosch-Rekveldt, Marian
    Hertogh, Marcel
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (06)
  • [47] Quality cost management model for construction projects
    Dolacek-Alduk, Zlata
    Radujkovic, Mladen
    Mikulic, Dunja
    GRADEVINAR, 2009, 61 (02): : 147 - 156
  • [48] Model of Predicting Cost Overrun in Construction Projects
    Plebankiewicz, Edyta
    SUSTAINABILITY, 2018, 10 (12)
  • [49] Impact of packaging on the cost of highway construction projects
    Zhang, Zhihui
    He, Qianru
    Qinghua Daxue Xuebao/Journal of Tsinghua University, 2010, 50 (06): : 830 - 833
  • [50] Preliminary Cost Estimating for Road Construction Projects
    Mahamid, Ibrahim
    Bruland, Amund
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3, 2010, : 158 - 161