Cold start-up condition model for heat recovery steam generators

被引:21
|
作者
Sindareh-Esfahani, Peyman [1 ]
Habibi-Siyahposh, Ehsan [2 ]
Saffar-Avval, Majid M [2 ]
Ghaffari, Ali [1 ]
Bakhtiari-Nejad, Firooz [2 ]
机构
[1] KN Toosi Univ Technology, Dept Mech Engn, Tehran, Iran
[2] Amirkabir Univ Technol, Dept Mech Engn, Tehran, Iran
关键词
Heat recovery steam generator; Cold start-up; Dynamic simulation; Genetic algorithm; POWER-PLANT; THERMODYNAMIC PROPERTIES; ROBUST-CONTROL; NONLINEAR MODEL; BOILER MODEL; WATER; SYSTEM; DESIGN; IDENTIFICATION; OPTIMIZATION;
D O I
10.1016/j.applthermaleng.2014.01.016
中图分类号
O414.1 [热力学];
学科分类号
摘要
A dynamic modeling of Heat Recovery Steam Generator (HRSG) during cold start-up operation in Combined Cycle Power Plant (CCPP) is introduced. In order to characterize the essential dynamic behavior of the HRSG during cold start-up; Dynamic equations of all HRSG's components are developed based on energy and mass balances. To describe precisely the operation of HRSG; a method based on nonlinear estimated functions for thermodynamic properties is applied to estimate the model parameters. Model parameters are evaluated by a designed algorithm based on Genetic Algorithm (GA). A wide set of experimental data is used to validate HRSG model during cold start-up operation. The simulation results show the reliability and validity of the developed model for cold start-up operation. (C) 2014 Elsevier: Ltd. All rights reserved.
引用
收藏
页码:502 / 512
页数:11
相关论文
共 50 条
  • [31] VAPOR DYNAMICS OF HEAT PIPE START-UP
    ISSACCI, F
    CATTON, I
    GHONIEM, NM
    JOURNAL OF HEAT TRANSFER-TRANSACTIONS OF THE ASME, 1991, 113 (04): : 985 - 994
  • [32] A SIMPLIFIED ANALYTICAL APPROACH FOR CALCULATING THE START-UP TIME OF INDUSTRIAL STEAM TURBINES FOR OPTIMAL AND FAST START-UP PROCEDURES
    Beer, Wolfgang
    Propp, Lukas
    Voelker, Lutz
    PROCEEDINGS OF THE ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2015, VOL 8, 2015,
  • [33] Start-up modes of thermoelectric generator based on vehicle exhaust waste heat recovery
    Yu, Shuhai
    Du, Qing
    Diao, Hai
    Shu, Gequn
    Jiao, Kui
    APPLIED ENERGY, 2015, 138 : 276 - 290
  • [34] Experimental Testing of a Computer Model for Simulating the Start-up Process in a Steam Generator.
    Dolezal, R.
    Kammer, G.v.d.
    1600, (58):
  • [35] Start-up model patently flawed
    Zoë Corbyn
    Nature, 2010, 466 : 303 - 303
  • [36] Start-up model patently flawed
    Corbyn, Zoe
    NATURE, 2010, 466 (7304) : 303 - 303
  • [37] THE BUSINESS MODEL OF A START-UP COMPANY
    Ujwary-Gil, Anna
    BUSINESS AND NON-PROFIT ORGANIZATIONS FACING INCREASED COMPETITION AND GROWING CUSTOMERS' DEMANDS, VOL 14, 2015, 14 : 111 - 122
  • [38] Accelerated start-up of the steam turbine by means of controlled cooling steam injection
    Badur, Janusz
    Bryk, Mateusz
    ENERGY, 2019, 173 : 1242 - 1255
  • [39] Optimization of the Start-up Behavior of Forced-Flow Once-Through Steam Generators with the Aid of a Physico-Mathematical Model.
    von der Kammer, Gunter
    Fortschritt-Berichte der VDI-Zeitschriften, Reihe 4: Bauingenieurwesen, 1977, (51 pt 6):
  • [40] Optimization of start-up scheduling and life assessment for a steam turbine
    Ji Dong-mei
    Sun Jia-qi
    Sun Quan
    Guo Heng-Chao
    Ren Jian-Xing
    Zhu Quan-jun
    ENERGY, 2018, 160 : 19 - 32