Optimization of start-up scheduling and life assessment for a steam turbine

被引:25
|
作者
Ji Dong-mei [1 ]
Sun Jia-qi [1 ,2 ]
Sun Quan [1 ]
Guo Heng-Chao [1 ]
Ren Jian-Xing [1 ]
Zhu Quan-jun [3 ]
机构
[1] Shanghai Univ Elect Power, Dept Energy & Mech Engn, Shanghai 200090, Peoples R China
[2] China Guodian Corp, Thermal & Power Co LTD, Puyang 457000, Henan, Peoples R China
[3] Global Energy Interconnect Res Inst, Beijing 102211, Peoples R China
基金
中国国家自然科学基金;
关键词
Steam turbine rotor; Start-up optimization; Creep-fatigue; Nonlinear continuous damage mechanics model; Life assessment; CYCLE POWER-PLANT; CONTINUUM DAMAGE MECHANICS; LOAD-INCREASING PROCESSES; DYNAMIC OPTIMIZATION; NEURAL-NETWORK; FATIGUE; SIMULATION; MODEL; PREDICTION; SYSTEM;
D O I
10.1016/j.energy.2018.07.015
中图分类号
O414.1 [热力学];
学科分类号
摘要
In order to meet the requirement of frequent start-stop of the units, it is significant to optimize the operation scheme of the unit. A novel optimized mathematical model of a steam turbine was proposed at a previous paper of this study's authors. In this study the supported vector machine (SVM) stress model of a 320 MW steam turbine was established based on 13 groups of start-up schemes. According to the novel optimized mathematical model and SVM stress model of the turbine, Genetic algorithm-particle swarm optimization was employed to search for the best values of the steam temperature rise rate. The optimization schedule can shorten the start-up time of 170 min in the premise of meeting the stress requirement. It is necessary to testify the feasibility of the optimized schedule, the fatigue, creep, and creep-fatigue life of the steam turbine rotor were analyzed by continuous damage mechanics (CDM) model. The results shown that the life assessment of the rotor from the nonlinear CDM is accordance with the bilinear failure criterion of ASME Section III, and the critical creep-fatigue damage of the rotor is 0.2083, and the life loss of the rotor after working 30 years under the optimized start-up schedule is 19.25%. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:19 / 32
页数:14
相关论文
共 50 条
  • [1] The optimization of the start-up scheduling for a 320 MW steam turbine
    Ji, Dong-Mei
    Sun, Jia-Qi
    Dui, Yue
    Ren, Jian-Xing
    [J]. ENERGY, 2017, 125 : 345 - 355
  • [2] Optimization of steam turbine start-up based on nonlinear function
    Dong, Chao
    Wang, Bin
    Sun, Yongjian
    Wang, Xiaohong
    [J]. PROCEEDINGS OF THE 32ND 2020 CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2020), 2020, : 505 - 510
  • [3] Accelerated start-up of the steam turbine by means of controlled cooling steam injection
    Badur, Janusz
    Bryk, Mateusz
    [J]. ENERGY, 2019, 173 : 1242 - 1255
  • [4] OPTIMIZATION ON START-UP PROCESS OF HIGH-PRESSURE ROTOR FOR LARGE POWER STEAM TURBINE
    Du, Qiu-Wan
    Zheng, Zhao-Li
    Xie, Yong-Hui
    [J]. THERMAL SCIENCE, 2016, 20 : S815 - S822
  • [5] Optimization of start-up conditions to reduce thermal loads in cooled components of a supercritical steam turbine
    Kosman, Wojciech
    [J]. JOURNAL OF POWER TECHNOLOGIES, 2015, 95 (05): : 47 - 53
  • [6] DIFFERENTIAL EXPANSION SENSITIVITY STUDIES DURING STEAM TURBINE START-UP
    Topel, Monika
    Jocker, Markus
    Paul, Sayantan
    Laumert, Bjorn
    [J]. PROCEEDINGS OF THE ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2015, VOL 8, 2015,
  • [7] Thermal Modeling of a Solar Steam Turbine With a Focus on Start-Up Time Reduction
    Spelling, James
    Jocker, Markus
    Martin, Andrew
    [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2012, 134 (01):
  • [8] THERMAL MODELING OF A SOLAR STEAM TURBINE WITH A FOCUS ON START-UP TIME REDUCTION
    Spelling, James
    Jocker, Markus
    Martin, Andrew
    [J]. PROCEEDINGS OF THE ASME TURBO EXPO 2011, VOL 3, 2012, : 1021 - 1030
  • [9] A Concept for Safe and Less Expensive Acceleration of a Marine Steam Turbine Start-up
    Bryk, Mateusz
    Gluch, Jerzy
    [J]. JOURNAL OF MARINE SCIENCE AND APPLICATION, 2023, 22 (02) : 381 - 394
  • [10] OPTIMIZATION OF THE START-UP TIME OF STEAM TURBOSETS WITH THE TURBOTROL-4 ELECTRONIC TURBINE CONTROL-SYSTEM
    GRUBER, H
    LOITZL, W
    [J]. BROWN BOVERI REVIEW, 1979, 66 (10): : 678 - 684