Optimization of start-up scheduling and life assessment for a steam turbine

被引:25
|
作者
Ji Dong-mei [1 ]
Sun Jia-qi [1 ,2 ]
Sun Quan [1 ]
Guo Heng-Chao [1 ]
Ren Jian-Xing [1 ]
Zhu Quan-jun [3 ]
机构
[1] Shanghai Univ Elect Power, Dept Energy & Mech Engn, Shanghai 200090, Peoples R China
[2] China Guodian Corp, Thermal & Power Co LTD, Puyang 457000, Henan, Peoples R China
[3] Global Energy Interconnect Res Inst, Beijing 102211, Peoples R China
基金
中国国家自然科学基金;
关键词
Steam turbine rotor; Start-up optimization; Creep-fatigue; Nonlinear continuous damage mechanics model; Life assessment; CYCLE POWER-PLANT; CONTINUUM DAMAGE MECHANICS; LOAD-INCREASING PROCESSES; DYNAMIC OPTIMIZATION; NEURAL-NETWORK; FATIGUE; SIMULATION; MODEL; PREDICTION; SYSTEM;
D O I
10.1016/j.energy.2018.07.015
中图分类号
O414.1 [热力学];
学科分类号
摘要
In order to meet the requirement of frequent start-stop of the units, it is significant to optimize the operation scheme of the unit. A novel optimized mathematical model of a steam turbine was proposed at a previous paper of this study's authors. In this study the supported vector machine (SVM) stress model of a 320 MW steam turbine was established based on 13 groups of start-up schemes. According to the novel optimized mathematical model and SVM stress model of the turbine, Genetic algorithm-particle swarm optimization was employed to search for the best values of the steam temperature rise rate. The optimization schedule can shorten the start-up time of 170 min in the premise of meeting the stress requirement. It is necessary to testify the feasibility of the optimized schedule, the fatigue, creep, and creep-fatigue life of the steam turbine rotor were analyzed by continuous damage mechanics (CDM) model. The results shown that the life assessment of the rotor from the nonlinear CDM is accordance with the bilinear failure criterion of ASME Section III, and the critical creep-fatigue damage of the rotor is 0.2083, and the life loss of the rotor after working 30 years under the optimized start-up schedule is 19.25%. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:19 / 32
页数:14
相关论文
共 50 条
  • [41] TRANSIENT FORCED RESPONSE ANALYSIS OF MISTUNED STEAM TURBINE BLADES DURING START-UP AND COAST-DOWN
    Siewert, Christian
    Stueer, Heinrich
    [J]. PROCEEDINGS OF THE ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2014, VOL 1B, 2014,
  • [42] AUTOMATION PROCESSES FOR THE HOT START-UP OF STEAM-GENERATORS
    BRECKNER, K
    [J]. BRENNSTOFF-WARME-KRAFT, 1992, 44 (06): : 279 - 280
  • [43] A METHOD FOR AXIAL COMPRESSOR START-UP ASSESSMENT
    Astrua, Pio
    Puppo, Enrico
    Cecchi, Stefano
    Silingardi, Andrea
    [J]. ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2015, VOL 3, 2015,
  • [44] START-UP PROCEDURES FOR HIGH CAPACITY BOILER/TURBINE UNITS
    SHMUKLER, BI
    [J]. THERMAL ENGINEERING, 1972, 18 (07) : 29 - &
  • [45] Selecting optimal conditions for the turbine warm and hot start-up
    Rusin, Andrzej
    Nowak, Grzegorz
    Lukowicz, Henryk
    Kosman, Wojciech
    Chmielniak, Tadeusz
    Kaczorowski, Maciej
    [J]. ENERGY, 2021, 214
  • [46] START-UP
    RAIKE, W
    [J]. BYTE, 1984, 9 (07): : 361 - 362
  • [47] START-UP
    BODIN, HAB
    [J]. NUCLEAR FUSION, 1974, : 455 - 470
  • [48] COMPARISON OF STEAM TURBINE PRE-WARMING AND WARM-KEEPING STRATEGIES USING HOT AIR FOR FAST TURBINE START-UP
    Pehle, Lukas
    Luczynski, Piotr
    Jeon, Taejun
    Wirsum, Manfred
    Mohr, Wolfgang F. D.
    Helbig, Klaus
    [J]. PROCEEDINGS OF THE ASME TURBO EXPO: TURBOMACHINERY TECHNICAL CONFERENCE AND EXPOSITION, VOL 9, 2020,
  • [49] Analysis to speed up of the start-up of steam boiler OP-380
    Taler, Jan
    Weglowski, Bohdan
    Dzierwa, Piotr
    Czuprynski, Piotr
    Madejski, Pawel
    Nabaglo, Daniel
    Zyrkowski, Cezary
    [J]. JOURNAL OF POWER TECHNOLOGIES, 2014, 94 (02):