START-UP PROCEDURES FOR HIGH CAPACITY BOILER/TURBINE UNITS

被引:0
|
作者
SHMUKLER, BI
机构
关键词
D O I
暂无
中图分类号
O414.1 [热力学];
学科分类号
摘要
引用
收藏
页码:29 / &
相关论文
共 50 条
  • [1] BOILER-TURBINE COORDINATION DURING START-UP AND LOADING OF LARGE UNITS
    HANZALEK, FJ
    IPSEN, PG
    [J]. MECHANICAL ENGINEERING, 1966, 88 (01) : 71 - &
  • [2] An automatic synthesis system for start-up operating procedures of boiler plants
    Lee, SG
    Han, SI
    Byun, YS
    Hwang, KS
    Kim, YH
    Shin, D
    Yoon, ES
    [J]. KOREAN JOURNAL OF CHEMICAL ENGINEERING, 2005, 22 (04) : 503 - 511
  • [3] An automatic synthesis system for start-up operating procedures of boiler plants
    Sung Gun Lee
    Sang il Han
    Yoon Sup Byun
    Kyu Suk Hwang
    Young Han Kim
    Dongil Shin
    En Sup Yoon
    [J]. Korean Journal of Chemical Engineering, 2005, 22 : 503 - 511
  • [4] EXPERIENCE IN DDC TURBINE START-UP
    HOWARD, JR
    [J]. ISA JOURNAL, 1966, 13 (07): : 61 - &
  • [5] FUEL AND HEAT CONSUMPTION DURING BOILER START-UP
    DOLEZAL, R
    [J]. BRENNSTOFF-WARME-KRAFT, 1972, 24 (05): : 193 - &
  • [6] Start-up improvement in turbine mode for high head PSP machine
    Houdeline, J. B.
    Liu, J.
    Lavigne, S.
    Laurant, Y.
    Balara, L.
    [J]. 26TH IAHR SYMPOSIUM ON HYDRAULIC MACHINERY AND SYSTEMS, PTS 1-7, 2013, 15
  • [7] Atypical start-up experiments on pump as turbine
    Zhang, Yu-Liang
    Zhao, Yan-Juan
    [J]. ADVANCES IN MECHANICAL ENGINEERING, 2021, 13 (11)
  • [8] 2 APPROACHES TO TURBINE START-UP AUTOMATION
    SELMECZY, JG
    FREY, A
    HARSEVOO.RJ
    [J]. ISA TRANSACTIONS, 1968, 7 (01) : 79 - &
  • [9] Optimization of boiler start-up using a nonlinear boiler model and hard constraints
    Krüger, K
    Franke, R
    Rode, M
    [J]. ENERGY, 2004, 29 (12-15) : 2239 - 2251
  • [10] Writing sensible start-up and shutdown procedures
    不详
    [J]. POWER, 2007, 151 (03) : 24 - 25