共 50 条
- [41] Start-up mode control for electrical drives of vibrational units [J]. CONTROL OF OSCILLATIONS AND CHAOS, VOLS 1-3, PROCEEDINGS, 2000, : 509 - 513
- [44] Start-Up Demonstration Tests for Products with Start-Up Delay [J]. QUALITY TECHNOLOGY AND QUANTITATIVE MANAGEMENT, 2013, 10 (03): : 329 - 338
- [45] OPTIMIZATION ON START-UP PROCESS OF HIGH-PRESSURE ROTOR FOR LARGE POWER STEAM TURBINE [J]. THERMAL SCIENCE, 2016, 20 : S815 - S822
- [47] USE OF CAVITY PLASMATRON IN PULVERIZED COAL MUFFLE BURNER FOR START-UP OF A BOILER [J]. RYNEK ENERGII, 2010, (01): : 132 - 136
- [48] OPTIMIZATION OF BOILER START-UP PROCESS BASED ON FUZZY REASONING AND PROCESS SIMULATION [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON POWER ENGINEERING 2009 (ICOPE-09), VOL 3, 2009, : 319 - 324
- [50] Coupling stress and fatigue analysis during cold start-up of the supercharged boiler [J]. Harbin Gongcheng Daxue Xuebao/Journal of Harbin Engineering University, 2021, 42 (07): : 997 - 1002