Start-up improvement in turbine mode for high head PSP machine

被引:2
|
作者
Houdeline, J. B. [1 ]
Liu, J.
Lavigne, S. [1 ]
Laurant, Y. [1 ]
Balara, L.
机构
[1] Alstom, Alstom Hydro Technol Ctr, Hydraul Dept, F-38041 Grenoble, France
关键词
D O I
10.1088/1755-1315/15/4/042022
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Pumped Storage Plants (PSP) using reversible pump-turbines are today the most efficient way of storing large amounts of electrical energy at acceptable costs. However, in order to suit high and sudden variations in power demand, a large amount of power must be available to be released quickly at the required time. When peak power production is required, then start-up in turbine mode must be fast, efficient and reliable. During start-up, the machine must operate at a stable speed close to the no-load condition (i.e. close to the runaway characteristic) while all synchronized guide vanes are open slightly. This is very challenging for high head units that can have an S-shaped characteristic in the turbine quadrant close to the no load condition. This paper focuses on a new hydraulic design that provides an improvement of the S-shaped characteristic and thus removes all speed instability sources during the start-up sequence of the turbine in a large operating head range while not involving a special stabilizing technique. Hydraulic design is fundamental for any PSP. Given the constraints in generating and pumping modes, S-shaped phenomena become even more important and then more difficult to be mastered for high head machines. Thanks to the pump-turbine design methodology, the use of CFD tools as well as model tests for optimization, a dedicated high head pump-turbine design was developed to achieve a significant improvement of the S-shaped characteristic using all synchronized guide vanes. This paper describes the S-shaped phenomena from a hydraulic point of view. We also detail the numerical study, the model tests results and the turbine coupling sequence simulation results for which a comparison is done between a typical high head design and a dedicated high head design to the S-shaped reduction.
引用
收藏
页数:10
相关论文
共 50 条
  • [1] Flow-Induced Vibration of Non-Rotating Structures of a High-Head Pump-Turbine during Start-Up in Turbine Mode
    Yang, Mengqi
    Zhao, Weiqiang
    Bi, Huili
    Yang, Haixia
    He, Qilian
    Huang, Xingxing
    Wang, Zhengwei
    ENERGIES, 2022, 15 (22)
  • [2] BUILDING A START-UP MACHINE
    Scott, Alex
    CHEMICAL & ENGINEERING NEWS, 2016, 94 (08) : 22 - 24
  • [3] EXPERIENCE IN DDC TURBINE START-UP
    HOWARD, JR
    ISA JOURNAL, 1966, 13 (07): : 61 - &
  • [4] START-UP PROCEDURES FOR HIGH CAPACITY BOILER/TURBINE UNITS
    SHMUKLER, BI
    THERMAL ENGINEERING, 1972, 18 (07) : 29 - &
  • [5] Atypical start-up experiments on pump as turbine
    Zhang, Yu-Liang
    Zhao, Yan-Juan
    ADVANCES IN MECHANICAL ENGINEERING, 2021, 13 (11)
  • [6] 2 APPROACHES TO TURBINE START-UP AUTOMATION
    SELMECZY, JG
    FREY, A
    HARSEVOO.RJ
    ISA TRANSACTIONS, 1968, 7 (01) : 79 - &
  • [7] Experimental investigations of transient pressure variations in a high head model Francis turbine during start-up and shutdown
    Trivedi, Chirag
    Cervantes, Michel J.
    Gandhi, B. K.
    Ole Dahlhaug, G.
    JOURNAL OF HYDRODYNAMICS, 2014, 26 (02) : 277 - 290
  • [8] Experimental investigations of transient pressure variations in a high head model Francis turbine during start-up and shutdown
    Chirag Trivedi
    Michel J. Cervantes
    B. K. Gandhi
    Dahlhaug G. Ole
    Journal of Hydrodynamics, 2014, 26 : 277 - 290
  • [9] Experimental investigations of transient pressure variations in a high head model Francis turbine during start-up and shutdown
    TRIVEDI Chirag
    CERVANTES Michel J.
    GANDHI B.K.
    OLE DAHLHAUG G.
    Journal of Hydrodynamics, 2014, 24 (02) : 277 - 290
  • [10] Numerical Investigation of Flow and Structural Characteristics of a Large High-Head Prototype Pump-Turbine during Turbine Start-Up
    Yin, Xilong
    Huang, Xingxing
    Zhang, Shaozheng
    Bi, Huili
    Wang, Zhengwei
    ENERGIES, 2023, 16 (09)