OPTIMIZATION OF THE START-UP TIME OF STEAM TURBOSETS WITH THE TURBOTROL-4 ELECTRONIC TURBINE CONTROL-SYSTEM

被引:0
|
作者
GRUBER, H
LOITZL, W
机构
来源
BROWN BOVERI REVIEW | 1979年 / 66卷 / 10期
关键词
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
引用
收藏
页码:678 / 684
页数:7
相关论文
共 25 条
  • [1] TURBOTROL-4 ELECTRONIC CONTROL-SYSTEM FOR STEAM-TURBINES BASED ON PC-200 EQUIPMENT
    ANDRES, W
    SCHAIBLE, W
    SCHATZMANN, G
    [J]. BROWN BOVERI REVIEW, 1975, 62 (09): : 377 - 386
  • [2] Optimization of start-up scheduling and life assessment for a steam turbine
    Ji Dong-mei
    Sun Jia-qi
    Sun Quan
    Guo Heng-Chao
    Ren Jian-Xing
    Zhu Quan-jun
    [J]. ENERGY, 2018, 160 : 19 - 32
  • [3] Optimization of steam turbine start-up based on nonlinear function
    Dong, Chao
    Wang, Bin
    Sun, Yongjian
    Wang, Xiaohong
    [J]. PROCEEDINGS OF THE 32ND 2020 CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2020), 2020, : 505 - 510
  • [4] The optimization of the start-up scheduling for a 320 MW steam turbine
    Ji, Dong-Mei
    Sun, Jia-Qi
    Dui, Yue
    Ren, Jian-Xing
    [J]. ENERGY, 2017, 125 : 345 - 355
  • [5] AUTOMATIC START-UP AND POWER CONTROL-SYSTEM FOR RESEARCH REACTORS
    HASSAN, MA
    SISEVICH, IG
    [J]. SOVIET ATOMIC ENERGY-USSR, 1971, 31 (01): : 698 - &
  • [6] Thermal Modeling of a Solar Steam Turbine With a Focus on Start-Up Time Reduction
    Spelling, James
    Jocker, Markus
    Martin, Andrew
    [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2012, 134 (01):
  • [7] THERMAL MODELING OF A SOLAR STEAM TURBINE WITH A FOCUS ON START-UP TIME REDUCTION
    Spelling, James
    Jocker, Markus
    Martin, Andrew
    [J]. PROCEEDINGS OF THE ASME TURBO EXPO 2011, VOL 3, 2012, : 1021 - 1030
  • [8] OPTIMIZATION ON START-UP PROCESS OF HIGH-PRESSURE ROTOR FOR LARGE POWER STEAM TURBINE
    Du, Qiu-Wan
    Zheng, Zhao-Li
    Xie, Yong-Hui
    [J]. THERMAL SCIENCE, 2016, 20 : S815 - S822
  • [9] Optimization of start-up conditions to reduce thermal loads in cooled components of a supercritical steam turbine
    Kosman, Wojciech
    [J]. JOURNAL OF POWER TECHNOLOGIES, 2015, 95 (05): : 47 - 53
  • [10] Thermal-FSI modeling of steam turbine accelerated start-up by means of cooling steam injection control
    Badur, Janusz
    Bryk, Mateusz
    [J]. JOURNAL OF POWER TECHNOLOGIES, 2020, 100 (02): : 115 - 119