摘要
This paper presents a geometric modeling of box girder deck to automate deck design representations. A geometric methodology was developed and implemented in a computer program. This software allows the geometric description of the deck, using bridge design data usually given at the conceptual stage, and the automation of several drawings and three-dimensional (3D) models, defined accurately. Using traditional graphical system, the execution of deck specific drawings is extremely time-consuming, the 3D deck model gives an approximation only of the exterior shape of the deck and the 3D finite elements (FE) mesh generation software imposes geometric simplifications on the real configuration of the deck before discretization. The computer application provides an important toot to the bridge designer, particularly at the conceptual stage, as it allows aesthetic and structural evaluation of the bridge at an early stage in the design. The geometric modeling process and graphical results of a case-study are presented. (C) 2003 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:55 / 66
页数:12
相关论文
共 50 条
  • [41] Design Equations and Example for FRP Deck-Steel Girder Bridge System
    Chen, An
    Davalos, Julio F.
    [J]. PRACTICE PERIODICAL ON STRUCTURAL DESIGN AND CONSTRUCTION, 2014, 19 (02)
  • [42] A new study on deck surfacing anti-slipping materials for steel-box girder bridge
    School of Materials Science and Engineering, Wuhan University of Technology, Wuhan 430070, China
    [J]. Jianzhu Cailiao Xuebao, 2009, 3 (276-280):
  • [43] Temperature field caused by bituminous deck pavement of steel-concrete composed box girder bridge
    Liu, Qiwei
    Ding, Feng
    Zhu, Jun
    Zhang, Rongfu
    [J]. Dongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Southeast University (Natural Science Edition), 2006, 36 (04): : 572 - 575
  • [44] BOX GIRDER BRIDGE DIAPHRAGMS WITH OPENINGS
    SARGIOUS, MA
    DILGER, WH
    HAWK, H
    [J]. JOURNAL OF THE STRUCTURAL DIVISION-ASCE, 1979, 105 (01): : 53 - 65
  • [46] Experimental investigation of a precast segmental Twin-Deck box girder bridge simultaneously erected with double bridge erection gantries
    Su, Xiaolong
    Zhou, Man
    Zhong, Jitao
    [J]. STRUCTURAL CONCRETE, 2023, 24 (04) : 4492 - 4503
  • [47] Investigation on materials for prefabricated bridge deck pavement and construction technology: Application to a case study of concrete box-girder bridge
    Liu, Yang
    Qian, Zhen-Dong
    Xie, Yu-Xin
    Xu, Shi-Qiao
    [J]. CASE STUDIES IN CONSTRUCTION MATERIALS, 2024, 20
  • [48] Transforming a Suspended Deck System to a Continuous Girder System for Basket-Handle Arch Bridge
    He, Guo-Meng
    Zhu, Shi-Feng
    Liu, Ang
    Han, Yong-Ping
    [J]. Bridge Construction, 2022, 52 (06) : 147 - 154
  • [49] Girder/deck connection for rapid removal of bridge decks
    Tadros, MK
    Badie, SS
    Kamel, MR
    [J]. PCI JOURNAL, 2002, 47 (03): : 58 - +
  • [50] A monitoring system for determination of real deck slab behaviour in prestressed box girder bridges
    Treacy, M. A.
    Bruehwiler, E.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, RESILIENCE AND SUSTAINABILITY, 2012, : 1495 - 1502