Investigation on materials for prefabricated bridge deck pavement and construction technology: Application to a case study of concrete box-girder bridge

被引:0
|
作者
Liu, Yang [1 ,2 ]
Qian, Zhen-Dong [1 ,3 ]
Xie, Yu-Xin [1 ]
Xu, Shi-Qiao [4 ]
机构
[1] Southeast Univ, Intelligent Transportat Syst Res Ctr, Nanjing 210096, Peoples R China
[2] Nanjing Modern Multimodal Transportat Lab, Nanjing 211100, Peoples R China
[3] Southeast Univ, Bridge Engn Res Ctr, Nanjing 210096, Peoples R China
[4] China Construct Eighth Engn Div Co Ltd, Engn Res Inst, Shanghai 200122, Peoples R China
基金
中国国家自然科学基金;
关键词
Prefabricated asphalt pavement; Concrete box -girder bridge; Construction technology; Self -compacting material; Joint treatment; SELF-COMPACTING CONCRETE; ASPHALT PAVEMENT; GUSSASPHALT; MIXTURES; BEHAVIOR;
D O I
10.1016/j.cscm.2024.e03185
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The asphalt bridge deck pavement (BDP) is usually constructed on site. The on-site construction quality of asphalt BDP is easily affected by environmental conditions, and the carbon emissions and polluting gas emissions during the construction need to be concerned. The development of prefabricated asphalt BDPs is an available way to mitigate the above problems, but application of prefabricated asphalt BDP has not yet realized due to the limitations of existing materials and construction technology. In this study, the objective is to investigate a feasible construction scheme for the prefabricated asphalt BDP on the concrete box-girder bridge. To achieve this goal, a self-compacting epoxy asphalt concrete (EAC) was developed as the prefabricated asphalt BDP material, and an epoxy asphalt mastic (EAM) was developed as the joint treatment material in the assembly of prefabricated asphalt BDPs. Subsequently, a complete and feasible construction process for the prefabricated asphalt BDP was proposed, and the novel prefabricated bridge deck composite structure of concrete box-girder bridge was designed. The results show that the selfcompacting EAC has sufficient fluidity and mechanical properties to meet the construction and performance requirements of prefabricated asphalt BDP. The superior physical and mechanical properties and good cooperative work performance with the origin pavement structure make the EAM an available joint treatment material. The feasible construction scheme of prefabricated asphalt BDP is that the self-compaction EAC is paved on the prefabricated main girder to make prefabrication segments, and then the prefabrication segments are transported to the engineering site and assembled. The prefabricated asphalt BDPs are connected by joint treatment with EAM. Given the height different of prefabricated base layer due to the assembly deviation, a wearing layer is constructed on site to achieve a good surface evenness of BDP.
引用
下载
收藏
页数:13
相关论文
共 50 条
  • [1] Bridge information models for construction of a concrete box-girder bridge
    Lee, K. M.
    Lee, Y. B.
    Shim, C. S.
    Park, K. L.
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2012, 8 (07) : 687 - 703
  • [2] Bridge Deck Replacement of Posttensioned Concrete Box-Girder Bridges
    Zhang, Youyou
    Chai, Y. H.
    JOURNAL OF BRIDGE ENGINEERING, 2020, 25 (12)
  • [3] An alternative technique to the demolition of a prestressed concrete box-girder bridge: A case study
    Pereira, S. S. R.
    Magalhaes, M. D. C.
    Gazzinelli, H.
    CASE STUDIES IN CONSTRUCTION MATERIALS, 2017, 6 : 192 - 197
  • [4] A study of the cracks of prestressed concrete continuous box-girder bridge
    Li, Min
    Wang, Zhuang
    PROCEEDINGS OF THE 2016 5TH INTERNATIONAL CONFERENCE ON CIVIL, ARCHITECTURAL AND HYDRAULIC ENGINEERING (ICCAHE 2016), 2016, 95 : 586 - 591
  • [5] Inelastic behavior of a continuous composite box-girder bridge with prefabricated slabs
    Shim, Chang-Su
    Ryu, Hyung-Keun
    Chung, Chul-Hun
    Youn, Seok-Goo
    Chang, Sung-Pil
    Composite Construction in Steel and Concrete V, 2006, : 57 - 66
  • [6] Experiment Study on Mechanical Characteristics Box Girder Bridge Considering Deck Pavement
    Zeng, Yan
    Zhang, Guangbin
    Wang, Zhiyong
    ADVANCES IN CIVIL ENGINEERING, PTS 1-4, 2011, 90-93 : 1216 - +
  • [7] Prestress identification in box-girder bridge deck under traffic load
    Law, S. S.
    Li, J.
    Wu, S. Q.
    PROCEEDINGS OF THE 3RD INTERNATIONAL SYMPOSIUM ON ENVIRONMENT VIBRATIONS: PREDICTION, MONITORING, MITIGATION AND EVALUATION, ISEV 2007, 2007, : 631 - 638
  • [8] Climatic Thermal Stresses in the Vatosund Box-Girder Concrete Bridge
    Larsson, Oskar
    STRUCTURAL ENGINEERING INTERNATIONAL, 2012, 22 (03) : 318 - 322
  • [9] LONGEST PRECAST CONCRETE BOX-GIRDER BRIDGE IN WESTERN HEMISPHERE
    ROTHMAN, HB
    CHANG, FK
    CIVIL ENGINEERING, 1974, 44 (03): : 56 - 60
  • [10] Remotely Controllable SHM System for a Concrete Box-girder Bridge
    Lee, Jong-Jae
    Koo, Ki-Young
    Hong, Jun-Young
    Yun, Chung-Bang
    EMBODING INTELLIGENCE IN STRUCTURES AND INTEGRATED SYSTEMS, 2009, 56 : 339 - +