Girder/deck connection for rapid removal of bridge decks

被引:4
|
作者
Tadros, MK [1 ]
Badie, SS
Kamel, MR
机构
[1] Univ Nebraska, Dept Civil Engn, Omaha, NE 68182 USA
[2] George Washington Univ, Dept Civil & Environm Engn, Washington, DC USA
[3] Dar El Handasah Consulting Engineers, Cairo, Egypt
来源
PCI JOURNAL | 2002年 / 47卷 / 03期
关键词
bridges; composite bridge; construction; decks; design (structural); durability; girders; precast concrete; prestressed concrete; research; shear keys; specifications; testing;
D O I
10.15554/pcij.05012002.58.69
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents a debonded shear key system for prestressed concrete bridge girders with composite cast-in-place decks. The system utilizes the mechanical anchorage of concrete shear keys created on the top flange of a concrete girder, combined with shear reinforcement crossing the interface. The system has the advantage of facilitating future deck removal, while protecting the top flange of the girder from damage, which is particularly significant for bridges in cold climates where deck concrete is subjected to deterioration due to freeze-thaw cycles and deicing chemicals. Theoretical background, experimental results, production issues, design criteria and construction specifications of this system are discussed. Details of the first bridge project using this system in Nebraska are also given. Lastly, a numerical design example is provided to show the required calculations for the proposed shear key system in composite girder bridges.
引用
收藏
页码:58 / +
页数:13
相关论文
共 50 条
  • [1] Evaluation of a Steel Girder Bridge Collapse during Deck Removal
    Jauregui, David V.
    [J]. JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2014, 28 (04)
  • [2] Precast concrete deck-to-girder mechanical connection for accelerated bridge construction
    Morcous, George
    Tawadrous, Raed
    [J]. PCI JOURNAL, 2020, 65 (03): : 37 - 52
  • [3] Methods to Increase Fatigue Life at Rib to Deck Connection in Orthotropic Steel Bridge Decks
    Diwakar, K. C.
    Dahal, Bhim Kumar
    Dangi, Harish
    [J]. CIVILENG, 2024, 5 (01): : 288 - 306
  • [4] Performance verification of a new pultruded GFRP bridge deck-to-girder connection system
    Park, Ki-Tae
    Hwang, Yoon-Koog
    Lee, Young-Ho
    Kim, Sun-Myung
    [J]. COMPOSITE STRUCTURES, 2007, 81 (01) : 114 - 124
  • [5] Analytical verification of a composite level of bolted GFRP bridge deck-to-girder connection system
    Park, K. T.
    [J]. COMPOSITE STRUCTURES, 2009, 89 (03) : 484 - 488
  • [6] Degree of composite action verification of bolted GFRP bridge deck-to-girder connection system
    Park, KT
    Kim, SH
    Lee, YH
    Hwang, YK
    [J]. COMPOSITE STRUCTURES, 2006, 72 (03) : 393 - 400
  • [7] Effects of Local Deck Removal on the Mechanical Behavior of Wide Box Composite Girder Bridge
    Su, Qingtian
    Wang, Dongfang
    Yang, Guotao
    [J]. ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 1192 - 1197
  • [8] Continuous precast concrete girder and slab bridge decks
    Marí, AR
    Montaner, J
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-STRUCTURES AND BUILDINGS, 2000, 140 (03) : 195 - 206
  • [9] Fatigue assessment for deck plates in orthotropic bridge decks
    Maljaars, Johan
    van Dooren, Frank
    Kolstein, Henk
    [J]. STEEL CONSTRUCTION-DESIGN AND RESEARCH, 2012, 5 (02): : 93 - 100
  • [10] STUDY OF WORKABILITY AND PUMPABILITY OF SELF-CONSOLIDATING CONCRETE USED IN BRIDGE DECK-GIRDER CONNECTION
    Cao, Qi
    Khayat, Kamal H.
    [J]. DESIGN, PERFORMANCE AND USE OF SELF-CONSOLIDATING CONCRETE (SCC 2014), 2014, 93 : 141 - 141