Risk evaluation of electric vehicle charging infrastructure public-private partnership projects in China using fuzzy TOPSIS

被引:85
|
作者
Liu, Jicheng [1 ]
Wei, Qiushuang [1 ]
机构
[1] North China Elect Power Univ, Sch Econ & Management, Beijing 102206, Peoples R China
基金
中国国家自然科学基金;
关键词
Electric vehicle; Charging infrastructure; PPP; Risk evaluation; Fuzzy TOPSIS; WATER-SUPPLY PROJECTS; SELECTION; MODEL; PERFORMANCE; ALLOCATION; RANKING; SUSTAINABILITY; IDENTIFICATION; FRAMEWORK; SYSTEMS;
D O I
10.1016/j.jclepro.2018.04.103
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
With increasing worldwide attention on clean energy and sustainability of environment development, electric vehicle (EV) projects have been growing in number and scale all over the world. However, increasing demand-supply imbalance in charging infrastructure becomes the major obstacle of Chinese EV development. Governments are applying Public-Private Partnership (PPP) mode in this field to effectively make use of solid capital and advanced technological capability of private sector to improve charging performance and service. To ensure project success, risk evaluation, which has remained nebulous, has become a crucial step. This paper aims to explore risk factors through questionnaire survey and calculate the overall risk levels of EV charging infrastructure PPP projects with an integrated approach with Fuzzy Order Preference by Similarity to Ideal Solution (Fuzzy TOPSIS). Results of risk factors identification consisted of project/technical, political/legal, economic and social/environmental risk categories and four risk factors were selected for specific concern of charging infrastructure in China: inadequate PPP project experience, high battery cost, long charging period and power price rise. Overall risk levels of three alternative projects were evaluated and ranked with proposed approach whose feasibility and effectiveness were verified through a comparative analysis and a sensitivity analysis. Moreover, awareness of existing risks, suggestions were provided for private sectors of EV charging infrastructure PPP project. The detailed implications and limitations were presented in the suggestions and the conclusions. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:211 / 222
页数:12
相关论文
共 50 条
  • [41] Assessment of the Critical Dispute Factors in Public-Private Partnership Infrastructure Projects
    Gunduz, Murat
    Naji, Khalid K.
    Al-Sharafi, Samar
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2024, 16 (04)
  • [42] Effect of promotion pressure and financial burden on investment in public-private partnership infrastructure projects in China
    Wang, Ling
    Zhou, Lihong
    Xiong, Yan
    Yan, Dongyi
    ASIAN-PACIFIC ECONOMIC LITERATURE, 2019, 33 (02) : 128 - 142
  • [43] Evaluation and ranking of risk factors in public-private partnership water supply projects in developing countries using fuzzy synthetic evaluation approach
    Ameyaw, Effah Ernest
    Chan, Albert P. C.
    EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (12) : 5102 - 5116
  • [44] Identifying Measures of Effective Risk Management for Public-Private Partnership Infrastructure Projects in Developing Countries
    Mazher, Khwaja Mateen
    Chan, Albert P. C.
    Choudhry, Rafiq M.
    Zahoor, Hafiz
    Edwards, David J.
    Ghaithan, Ahmed M.
    Mohammed, Awsan
    Aziz, Mubashir
    SUSTAINABILITY, 2022, 14 (21)
  • [45] Risk-based integrated performance assessment framework for public-private partnership infrastructure projects
    Fatima, Anam
    Mubin, Sajjad
    Masood, Rehan
    ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2024, 16 (01): : 251 - 274
  • [46] Study on Identification of Spurious Public-Private Partnership Projects in China
    Liang, Qingxue
    Hu, Hao
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2020, 67 (02) : 376 - 384
  • [47] Neurofuzzy Decision Support System for Efficient Risk Allocation in Public-Private Partnership Infrastructure Projects
    Jin, Xiao-Hua
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2010, 24 (06) : 525 - 538
  • [48] Study on Identification of Spurious Public-Private Partnership Projects in China
    Liang, Qingxue
    Hu, Hao
    IEEE Transactions on Engineering Management, 2020, 67 (02): : 376 - 384
  • [49] A Fuzzy Approach for the Allocation of Risks in Public-Private Partnership Water-Infrastructure Projects in Developing Countries
    Ameyaw, Ernest Effah
    Chan, Albert P. C.
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2016, 22 (03)
  • [50] RISK-MANAGEMENT OF PUBLIC-PRIVATE PARTNERSHIP INNOVATION PROJECTS
    Hrytsenko, Larysa
    Boiarko, Iryna
    Tverezovska, Oleksandra
    Polcyn, Jan
    Miskiewicz, Radoslaw
    MARKETING AND MANAGEMENT OF INNOVATIONS, 2021, (02): : 155 - 165