Risk evaluation of electric vehicle charging infrastructure public-private partnership projects in China using fuzzy TOPSIS

被引:85
|
作者
Liu, Jicheng [1 ]
Wei, Qiushuang [1 ]
机构
[1] North China Elect Power Univ, Sch Econ & Management, Beijing 102206, Peoples R China
基金
中国国家自然科学基金;
关键词
Electric vehicle; Charging infrastructure; PPP; Risk evaluation; Fuzzy TOPSIS; WATER-SUPPLY PROJECTS; SELECTION; MODEL; PERFORMANCE; ALLOCATION; RANKING; SUSTAINABILITY; IDENTIFICATION; FRAMEWORK; SYSTEMS;
D O I
10.1016/j.jclepro.2018.04.103
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
With increasing worldwide attention on clean energy and sustainability of environment development, electric vehicle (EV) projects have been growing in number and scale all over the world. However, increasing demand-supply imbalance in charging infrastructure becomes the major obstacle of Chinese EV development. Governments are applying Public-Private Partnership (PPP) mode in this field to effectively make use of solid capital and advanced technological capability of private sector to improve charging performance and service. To ensure project success, risk evaluation, which has remained nebulous, has become a crucial step. This paper aims to explore risk factors through questionnaire survey and calculate the overall risk levels of EV charging infrastructure PPP projects with an integrated approach with Fuzzy Order Preference by Similarity to Ideal Solution (Fuzzy TOPSIS). Results of risk factors identification consisted of project/technical, political/legal, economic and social/environmental risk categories and four risk factors were selected for specific concern of charging infrastructure in China: inadequate PPP project experience, high battery cost, long charging period and power price rise. Overall risk levels of three alternative projects were evaluated and ranked with proposed approach whose feasibility and effectiveness were verified through a comparative analysis and a sensitivity analysis. Moreover, awareness of existing risks, suggestions were provided for private sectors of EV charging infrastructure PPP project. The detailed implications and limitations were presented in the suggestions and the conclusions. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:211 / 222
页数:12
相关论文
共 50 条
  • [21] Public-Private Partnership - an Actual Form of Implementation of Infrastructure Projects
    Druzhkov, K. V.
    Eremin, V. L.
    EKONOMIKA I MATEMATICESKIE METODY-ECONOMICS AND MATHEMATICAL METHODS, 2018, 54 (04): : 111 - 115
  • [22] Infrastructure Projects Implementation in the Region by Virtue of Public-Private Partnership
    Ivanov, V. Y.
    PROCEEDINGS OF THE INTERNATIONAL SCIENTIFIC CONFERENCE FAR EAST CON (ISCFEC 2018), 2018, 47 : 1314 - 1318
  • [23] Can public-private partnerships promote sustainable electric vehicle charging infrastructure deployment?
    Wang, Yusheng
    Jiang, Ke
    Liu, Yuxi
    Jiang, Yan
    Huang, Yaxing
    ENERGY, 2025, 320
  • [24] Risk assessment for public-private partnership projects: using a fuzzy analytic hierarchical process method and expert opinion in China
    Li, Yan
    Wang, Xinyu
    JOURNAL OF RISK RESEARCH, 2018, 21 (08) : 952 - 973
  • [25] Review of studies on risk allocation and sharing in public-private partnership projects for infrastructure delivery
    Mazher, Khwaja Mateen
    FRONTIERS IN BUILT ENVIRONMENT, 2025, 11
  • [26] Operational Risk Management of Public-Private Partnership Infrastructure Projects: A Bibliometric Literature Review
    Jiang, Weiling
    Yang, Qianying
    Jiang, Jie
    Martek, Igor
    Gao, Fanjie
    BUILDINGS, 2022, 12 (11)
  • [27] Developing a framework of retained risk in Public-Private Partnership (PPP) social infrastructure projects
    Doloi, H. K.
    Raisbeck, P.
    INNOVATIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, VOLS 1 AND 2, 2008, : 1513 - 1518
  • [28] METHODOLOGY OF EVALUATION OF PERFORMANCE OF PUBLIC-PRIVATE PARTNERSHIP PROJECTS
    Kuznyetsova, A.
    Klipkova
    Maslov, V
    FINANCIAL AND CREDIT ACTIVITY-PROBLEMS OF THEORY AND PRACTICE, 2021, 6 (41): : 339 - 349
  • [29] New Tool to Screen Financial Viability of Alternative Public-Private Partnership Structures for Delivery of Electric Vehicle-Charging Infrastructure
    DeCorla-Souza, Patrick
    Hossain, Mahir
    WORLD ELECTRIC VEHICLE JOURNAL, 2025, 16 (01):
  • [30] Preferred risk allocation in China's public-private partnership (PPP) projects
    Ke, Yongjian
    Wang, ShouQing
    Chan, Albert P. C.
    Lam, Patrick T. I.
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2010, 28 (05) : 482 - 492