Risk evaluation of electric vehicle charging infrastructure public-private partnership projects in China using fuzzy TOPSIS

被引:85
|
作者
Liu, Jicheng [1 ]
Wei, Qiushuang [1 ]
机构
[1] North China Elect Power Univ, Sch Econ & Management, Beijing 102206, Peoples R China
基金
中国国家自然科学基金;
关键词
Electric vehicle; Charging infrastructure; PPP; Risk evaluation; Fuzzy TOPSIS; WATER-SUPPLY PROJECTS; SELECTION; MODEL; PERFORMANCE; ALLOCATION; RANKING; SUSTAINABILITY; IDENTIFICATION; FRAMEWORK; SYSTEMS;
D O I
10.1016/j.jclepro.2018.04.103
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
With increasing worldwide attention on clean energy and sustainability of environment development, electric vehicle (EV) projects have been growing in number and scale all over the world. However, increasing demand-supply imbalance in charging infrastructure becomes the major obstacle of Chinese EV development. Governments are applying Public-Private Partnership (PPP) mode in this field to effectively make use of solid capital and advanced technological capability of private sector to improve charging performance and service. To ensure project success, risk evaluation, which has remained nebulous, has become a crucial step. This paper aims to explore risk factors through questionnaire survey and calculate the overall risk levels of EV charging infrastructure PPP projects with an integrated approach with Fuzzy Order Preference by Similarity to Ideal Solution (Fuzzy TOPSIS). Results of risk factors identification consisted of project/technical, political/legal, economic and social/environmental risk categories and four risk factors were selected for specific concern of charging infrastructure in China: inadequate PPP project experience, high battery cost, long charging period and power price rise. Overall risk levels of three alternative projects were evaluated and ranked with proposed approach whose feasibility and effectiveness were verified through a comparative analysis and a sensitivity analysis. Moreover, awareness of existing risks, suggestions were provided for private sectors of EV charging infrastructure PPP project. The detailed implications and limitations were presented in the suggestions and the conclusions. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:211 / 222
页数:12
相关论文
共 50 条
  • [1] Private-sector partner selection for public-private partnership projects of electric vehicle charging infrastructure
    Zhang, Lihui
    Zhao, Zhenli
    Kan, Zhinan
    ENERGY SCIENCE & ENGINEERING, 2019, 7 (05) : 1469 - 1484
  • [2] Innovative Application of the Public-Private Partnership Model to the Electric Vehicle Charging Infrastructure in China
    Yang, Tong
    Long, Ruyin
    Li, Wenbo
    Ur Rehman, Saif
    SUSTAINABILITY, 2016, 8 (08):
  • [3] Charge pricing model for electric vehicle charging infrastructure public-private partnership projects in China: A system dynamics analysis
    Zhang, Lihui
    Zhao, Zhenli
    Xin, He
    Chai, Jianxue
    Wang, Gang
    JOURNAL OF CLEANER PRODUCTION, 2018, 199 : 321 - 333
  • [4] Risk management of public-private partnership charging infrastructure projects in China based on a three-dimension framework
    Wu, Yunna
    Song, Zixin
    Li, Lingwenying
    Xu, Ruhang
    ENERGY, 2018, 165 : 1089 - 1101
  • [5] Risk Misallocation in Public-Private Partnership Projects in China
    Ke, Yongjian
    Wang, Shouqing
    Chan, Albert P. C.
    INTERNATIONAL PUBLIC MANAGEMENT JOURNAL, 2013, 16 (03) : 438 - 460
  • [6] Public-Private Partnerships in the Electric Vehicle Charging Infrastructure in China: An Illustrative Case Study
    Wang, Kun
    Ke, Yongjian
    ADVANCES IN CIVIL ENGINEERING, 2018, 2018
  • [7] Evolutionary dynamics of promoting electric vehicle-charging infrastructure based on public-private partnership cooperation
    Huang, Xingjun
    Lin, Yun
    Lim, Ming K.
    Zhou, Fuli
    Ding, Rui
    Zhang, Zusheng
    ENERGY, 2022, 239
  • [8] Ex Post Risk Management in Public-Private Partnership Infrastructure Projects
    Xiong, Wei
    Zhao, Xianbo
    Yuan, Jing-Feng
    Luo, Sai
    PROJECT MANAGEMENT JOURNAL, 2017, 48 (03) : 76 - 89
  • [9] RISK MANAGEMENT AT REALIZATION OF INFRASTRUCTURE PROJECTS UNDER PUBLIC-PRIVATE PARTNERSHIP
    Hrytsenko, L. L.
    Krasulya, T. Y.
    ACTUAL PROBLEMS OF ECONOMICS, 2011, (126): : 85 - 90
  • [10] Risk Allocation in Public-Private Partnership Infrastructure Projects: Comparative Study
    Ke, Yongjian
    Wang, ShouQing
    Chan, Albert P. C.
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2010, 16 (04) : 343 - 351