Two approaches to handle the dynamism in a scheduling problem with sequence-dependent setup times

被引:3
|
作者
Angel-Bello, Francisco [1 ]
Vallikavungal, Jobish [1 ]
Alvarez, Ada [2 ]
机构
[1] Tecnol Monterrey, Escuela Ingn & Ciencias, Monterrey, Mexico
[2] Univ Autonoma Nuevo Leon, Fac Ingn Mecan & Elect, San Nicolas De Los Garza, Nuevo Leon, Mexico
关键词
Dynamic scheduling; Continuous rescheduling; Periodic rescheduling; Sequence-dependent setups; Single machine; MACHINE; ALGORITHM; MAKESPAN; POLICIES;
D O I
10.1016/j.eswa.2020.114137
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In this work we address the minimization of the makespan in a scheduling problem where the machine setup times are sequence-dependent. The jobs, which arrive throughout the production process, has a release time that is unknown in advance. Considering both, dynamic environments and sequence-dependent setup times, make the problem more realistic, but also more challenging from an algorithmic and modeling point of view. To deal with the addressed problem, we implement the continuous and periodic rescheduling approaches, providing them with the same re-optimization methods. To implement the re-optimization methods, we design two insertion procedures for adding the new released jobs in the processing sequence, as well as improvement procedures, based on Iterated Greedy strategies, to reduce the sequence makespan. In the improvement phase of the Iterated Greedy strategies we implement three improvement methods that combine four local searches. The developed algorithms are assessed based on the quality of the solutions they find and the CPU time they consume to reach these solutions. We use instances from the literature and larger instances generated in this work. The three algorithm versions showed quality solutions when compared with optimal solutions for the static problem and with solutions of the Perfect Information Model for the dynamic problem. Additionally, they showed a good performance for both the continuous and periodic approach. When these two approaches are compared, results indicate that the continuous approach would be the most appropriate when the proportion of dynamic jobs is low, while when the proportion is high, it would seem more advisable to use the periodic approach, appropriately selecting the frequency of re-optimization processes.
引用
收藏
页数:14
相关论文
共 50 条
  • [21] A hybrid genetic algorithm for the single machine scheduling problem with sequence-dependent setup times
    Sioud, A.
    Gravel, M.
    Gagne, C.
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (10) : 2415 - 2424
  • [22] Advanced Algorithms for the Reclaimer Scheduling Problem with Sequence-Dependent Setup Times and Availability Constraints
    Benbrik, Oualid
    Benmansour, Rachid
    Elidrissi, Abdelhak
    Sifaleras, Angelo
    METAHEURISTICS, MIC 2024, PT I, 2024, 14753 : 291 - 308
  • [23] A note on "the capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
    Almada-Lobo, Bernardo
    Oliveira, Jose F.
    Carravilla, Maria Antonia
    COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (04) : 1374 - 1376
  • [24] A worker constrained flexible job shop scheduling problem with sequence-dependent setup times
    Dominik Kress
    David Müller
    Jenny Nossack
    OR Spectrum, 2019, 41 : 179 - 217
  • [25] The distributionally robust machine scheduling problem with job selection and sequence-dependent setup times
    Bruni, M. E.
    Khodaparasti, S.
    Demeulemeester, E.
    COMPUTERS & OPERATIONS RESEARCH, 2020, 123
  • [26] A worker constrained flexible job shop scheduling problem with sequence-dependent setup times
    Kress, Dominik
    Mueller, David
    Nossack, Jenny
    OR SPECTRUM, 2019, 41 (01) : 179 - 217
  • [27] Simulation optimization for the stochastic economic lot scheduling problem with sequence-dependent setup times
    Loehndorf, Nils
    Riel, Manuel
    Minner, Stefan
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2014, 157 : 170 - 176
  • [28] A Selective Scheduling Problem with Sequence-dependent Setup Times: A Risk-averse Approach
    Bruni, Maria Elena
    Khodaparasti, Sara
    Beraldi, Patrizia
    ICORES: PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON OPERATIONS RESEARCH AND ENTERPRISE SYSTEMS, 2019, : 195 - 201
  • [29] Permutation flowshops in group scheduling with sequence-dependent setup times
    Naderi, B.
    Salmasi, Nasser
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2012, 6 (02) : 177 - 198
  • [30] Scheduling flowshops with finite buffers and sequence-dependent setup times
    Norman, Bryan A.
    Computers and Industrial Engineering, 1999, 36 (01): : 163 - 177