Gotthard base tunnel: Testing system for concrete mixtures

被引:2
|
作者
Zbinden, Peter [1 ]
机构
[1] AlpTransit Gotthard AG, CH-6003 Luzern, Switzerland
关键词
D O I
10.1002/best.200600527
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
AlpTransit Gotthard is a future-orientated project for a high speed railway through the Swiss Alps. The base tunnel under the St. Gotthard massif - with 57 kilometre the world's longest tunnel - is the core structure of the new transalpine Gotthard railway-line. This 21st century project will significantly improve passenger travel and freight transport in the heart of Europe. The main features of the project and the processing of the excavated material will be presented. The applied testing system for concrete mixtures, the contractual conditions and the implementation on site will be explained. The construction of the Gotthard Base Tunnel will produce approx. 24 million tonnes of excavated rock. This huge amount of material has a large potential to be converted into concrete aggregates. Already in 1993 an innovative testing programme for concrete mixtures was launched in order to prove that high-quality concrete can be produced using TBM-excavated material. The permanent testing on site ensures, that the produced concrete will meet the high requirements in tunnel construction.
引用
收藏
页码:11 / 18
页数:8
相关论文
共 50 条
  • [21] Gotthard base tunnel - tunnelling in the influence zone of two concrete arch dams; [Gotthard basistunnel - tunnelbau im einflussbereich von zwei bogenmauern]
    Ehrbar H.
    Bremen R.
    Otto B.
    Geomechanik und Tunnelbau, 2010, 3 (05): : 428 - 441
  • [22] Site ventilation of a long deep tunnel: The lot Bodio of the Gotthard base tunnel
    Oberaigner, M.
    Romerio, F.
    UNDERGROUND SPACE - THE 4TH DIMENSION OF METROPOLISES, VOLS 1-3, 2007, : 1717 - 1719
  • [23] Convergences and core extrusions during construction of the Gotthard Base Tunnel
    Cantieni, L.
    Anagnostou, G.
    Hug, R.
    HARMONISING ROCK ENGINEERING AND THE ENVIRONMENT, 2012, : 1639 - 1644
  • [24] Gotthard Base Tunnel: Work progress at the five construction sections
    Rehbock-Sander, M.
    Gerdes, A.
    UNDERGROUND SPACE - THE 4TH DIMENSION OF METROPOLISES, VOLS 1-3, 2007, : 1223 - 1228
  • [25] The use of open tunnel boring machines in squeezing rock in the gotthard base tunnel
    Gollegger, Johannes
    Priller, Anton
    Rausch, Meike
    Geomechanik und Tunnelbau, 2009, 2 (05): : 591 - 600
  • [26] Coordinated extension of the railway power supply of the Gotthard Base Tunnel
    Erstellung der übergeordneten bahnenergieversorgung am Gotthard-Basistunnel
    Werner, Gunnar (gunnar.werner@sbb.ch), 1600, DIV Deutscher Industrieverlag GmbH (115): : 6 - 7
  • [27] Risk, Contract Management, and Financing of the Gotthard Base Tunnel in Switzerland
    Fabbri, Davide
    ENGINEERING, 2019, 5 (03) : 379 - 383
  • [28] The excavation-induced convergences in the Sedrun section of the Gotthard Base Tunnel
    Mezger, F.
    Anagnostou, G.
    Ziegler, H-J.
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2013, 38 : 447 - 463
  • [29] Strength, deformability and permeability of kakiritic rocks from the Gotthard base tunnel
    Vogelhuber, Martin
    Pimentel, Erich
    Anagnostou, Georgios
    JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2023, 15 (09) : 2224 - 2237
  • [30] Gotthard Base Tunnel in Sedrun - Experience with the construction and operation of two shafts
    Gotthard Basistunnel in Sedrun - Erfahrungen aus Bau und Betrieb von zwei Schächten
    Höfle, H. (hartmuth.hoefle@alptransit.ch), 1600, Ernst und Sohn (06):