Site ventilation of a long deep tunnel: The lot Bodio of the Gotthard base tunnel

被引:0
|
作者
Oberaigner, M. [1 ]
Romerio, F. [1 ]
机构
[1] Lombardi Engn Ltd, Minusio, Switzerland
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the future several very long tunnels with a high overburden are going to be built in Europe and all around the world. These structures mostly consist of two parallel running tunnels plus cross passages at regular distances. Generally all of these constructions are divided into several lots and consist of a combination of TBM or shield drives together with NATM drives. The automated drives tend to achieve 10,000 meters in length and beyond, cross passages or other special cross sections are usually carried out by NATM. Thus they comprise a huge challenge regarding the supply of fresh air. Fumes of the drill-and-blast-sections, exhaust gases, any dust created through excavating or mucking, etc. have to be extracted and fresh air has to be brought up to the TBMs heads. Due to the extreme lengths and the need to simultaneously casting the inner lining the application of flexible ventilation ducts to carry the fresh air from the exterior to the tunnel head is almost impossible. Therefore a recirculation ventilation system is established during construction.
引用
收藏
页码:1717 / 1719
页数:3
相关论文
共 50 条
  • [1] Brittle tectonics in metamorphic rocks: Implications for the excavation of the Bodio Section of the Gotthard Base Tunnel
    Bonzanigo, L.
    ROCK MECHANICS: MEETING SOCIETY'S CHALLENGES AND DEMANDS, VOLS 1 AND 2: VOL: FUNDAMENTALS, NEW TECHNOLOGIES & NEW IDEAS; VOL 2: CASE HISTORIES, 2007, : 1141 - 1147
  • [2] The Gotthard Base Tunnel
    Der Gotthard-Basistunnel
    1600, GDMB Gesellschaft fur Bergbau, Metallurgie, Rohstoff- und Umwelttechnik e.V. (68):
  • [3] Gotthard Base Tunnel
    Gotthard-Basistunnel
    Ehrbar, Heinz, 1600, Wilhelm Ernst and Sohn (09):
  • [4] St Gotthard base tunnel
    Anon
    Fire International, 2002, (196):
  • [5] Planning the Gotthard base tunnel
    Gehriger, Willy
    Tunnels and Tunnelling International, 1993, 25 (12): : 34 - 36
  • [6] Gotthard Base Tunnel - the world's longest tunnel
    Simoni, Renzo
    BETON- UND STAHLBETONBAU, 2013, 108 : 15 - 24
  • [7] The railway equipment of the Gotthard base tunnel
    Bratschi, Oliver
    ZEV Rail Glasers Annalen, 2008, 132 (10): : 447 - 450
  • [8] Application of the decision AIDS for tunneling in the Gotthard and Lotschberg base tunnel projects, Part 1 - Gotthard base tunnel
    Einstein, Herbert
    Descoeudres, Francois
    Dudt, Jean-Paul
    Swiss Bulletin for Applied Geology, 2019, 24 (01): : 81 - 100
  • [9] Gotthard base tunnel: planning and design
    T&T International, 1998, 30 (09):
  • [10] Grouting works at the Gotthard Base Tunnel
    Injektionsmaßnahmen am Gotthard-Basistunnel
    1600, Ernst und Sohn (06):