BIM4D-based scheduling for assembling and lifting in precast-enabled construction

被引:27
|
作者
Huang, Lihui [1 ,2 ]
Pradhan, Roshan [2 ]
Dutta, Souravik [2 ,3 ]
Cai, Yiyu [1 ,2 ]
机构
[1] Nanyang Technol Univ, SJ NTU Corp Lab, 61 Nanyang Dr, Singapore 637335, Singapore
[2] Nanyang Technol Univ, Sch Mech & Aerosp Engn, 50 Nanyang Ave, Singapore 639798, Singapore
[3] Nanyang Technol Univ, Energy Res Inst NTU, Interdisciplinary Grad Programme, 50 Nanyang Dr,Res Techno Plaza, Singapore 637553, Singapore
关键词
Optimal scheduling; Precast assembly; Lifting path planning; Building information modeling; Tower crane; Genetic algorithm; GENETIC ALGORITHM; OPTIMIZATION; MODEL;
D O I
10.1016/j.autcon.2021.103999
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This research addresses the problem of assembly scheduling in crane-assisted precast construction while considering issues of building layout interference and optimal crane lifting. Traditionally, assembly scheduling and lifting path planning are treated as two separate issues due to their distinct natures. The current work introduces an approach that combines them for precast construction planning to achieve a comprehensive and costeffective solution. A BIM4D-based Intelligent Assembly Scheduler (BIAS) is designed in conjunction with the Computer-Aided Lifting Planner developed at Nanyang Technological University, Singapore. BIM4D is the Building Information Modeling (BIM) with the time dimension (i.e., scheduling information). Our scheduler takes an inbuilt timeframe for selected precast elements from BIM4D as input and outputs the micro-schedule in terms of the assembly sequence for these precast elements. This problem is solved using multi-objective optimization. Given a group of precast elements and their BIM4D timeframe, the micro-scheduling is determined based on (1) the relative importance of the elements' physical properties, (2) the interference (neighbouring relation) among the elements' positions, and (3) collision-free lifting paths of the elements. A Multi-level Elitist Genetic Algorithm (MEGA) is proposed to determine the optimal sequence taking into consideration of both assembling and lifting for the elements. A case study is performed with the BIM4D data of a residential building. The results of the case study demonstrate BIAS's efficiency and effectiveness for BIM4D based construction scheduling.
引用
收藏
页数:14
相关论文
共 50 条
  • [31] Evaluation of 4D BIM tools applicability in construction planning efficiency
    Martins, Savio Santana
    Jorge Evangelista, Ana Catarina
    Hammad, Ahmed W. A.
    Tam, Vivian W. Y.
    Haddad, Assed
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (15) : 2987 - 3000
  • [32] A VR training scenario editor for operation in construction based on BIM 4D and domain expert authoring
    Schiavi, Barbara
    Havard, Vincent
    Beddiar, Karim
    Baudry, David
    SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2023, 12 (05) : 1074 - 1089
  • [33] CULTURE CHANGE IN CONSTRUCTION INDUSTRY: FROM 2D TOWARD BIM BASED CONSTRUCTION
    Babic, Nenad. Cus
    Rebolj, Danijel
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2016, 21 : 86 - 99
  • [34] BIM-Based Construction Scheduling Method Using Optimization Theory for Reducing Activity Overlaps
    Moon, Hyounseok
    Kim, Hyeonseung
    Kamat, Vineet R.
    Kang, Leenseok
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2015, 29 (03)
  • [35] Spatiotemporal Modeling of Lifting Task Scheduling for Tower Cranes With a Tabu Search and 4-D Simulation
    Wu, Keyi
    de Soto, Borja Garcia
    FRONTIERS IN BUILT ENVIRONMENT, 2020, 6
  • [36] Empirical study on the merit of web-based 4D visualization in collaborative construction planning and scheduling
    Kang, Julian H.
    Anderson, Stuart D.
    Clayton, Mark J.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2007, 133 (06) : 447 - 461
  • [37] Using 4D BIM to assess construction risks during the design phase
    Jin, Ziyu
    Gambatese, John
    Liu, Ding
    Dharmapalan, Vineeth
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (11) : 2637 - 2654
  • [38] The Creation of Construction Schedules in 4D BIM: A Comparison of Conventional and Automated Approaches
    Doukari, Omar
    Seck, Boubacar
    Greenwood, David
    BUILDINGS, 2022, 12 (08)
  • [39] Interior construction state recognition with 4D BIM registered image sequences
    Kropp, Christopher
    Koch, Christian
    Koenig, Markus
    AUTOMATION IN CONSTRUCTION, 2018, 86 : 11 - 32
  • [40] The adoption of 4D BIM in the UK construction industry: an innovation diffusion approach
    Gledson, Barry J.
    Greenwood, David
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (06) : 950 - 967