BIM4D-based scheduling for assembling and lifting in precast-enabled construction

被引:29
|
作者
Huang, Lihui [1 ,2 ]
Pradhan, Roshan [2 ]
Dutta, Souravik [2 ,3 ]
Cai, Yiyu [1 ,2 ]
机构
[1] Nanyang Technol Univ, SJ NTU Corp Lab, 61 Nanyang Dr, Singapore 637335, Singapore
[2] Nanyang Technol Univ, Sch Mech & Aerosp Engn, 50 Nanyang Ave, Singapore 639798, Singapore
[3] Nanyang Technol Univ, Energy Res Inst NTU, Interdisciplinary Grad Programme, 50 Nanyang Dr,Res Techno Plaza, Singapore 637553, Singapore
关键词
Optimal scheduling; Precast assembly; Lifting path planning; Building information modeling; Tower crane; Genetic algorithm; GENETIC ALGORITHM; OPTIMIZATION; MODEL;
D O I
10.1016/j.autcon.2021.103999
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This research addresses the problem of assembly scheduling in crane-assisted precast construction while considering issues of building layout interference and optimal crane lifting. Traditionally, assembly scheduling and lifting path planning are treated as two separate issues due to their distinct natures. The current work introduces an approach that combines them for precast construction planning to achieve a comprehensive and costeffective solution. A BIM4D-based Intelligent Assembly Scheduler (BIAS) is designed in conjunction with the Computer-Aided Lifting Planner developed at Nanyang Technological University, Singapore. BIM4D is the Building Information Modeling (BIM) with the time dimension (i.e., scheduling information). Our scheduler takes an inbuilt timeframe for selected precast elements from BIM4D as input and outputs the micro-schedule in terms of the assembly sequence for these precast elements. This problem is solved using multi-objective optimization. Given a group of precast elements and their BIM4D timeframe, the micro-scheduling is determined based on (1) the relative importance of the elements' physical properties, (2) the interference (neighbouring relation) among the elements' positions, and (3) collision-free lifting paths of the elements. A Multi-level Elitist Genetic Algorithm (MEGA) is proposed to determine the optimal sequence taking into consideration of both assembling and lifting for the elements. A case study is performed with the BIM4D data of a residential building. The results of the case study demonstrate BIAS's efficiency and effectiveness for BIM4D based construction scheduling.
引用
收藏
页数:14
相关论文
共 50 条
  • [41] CONSTRUCTION HEALTH AND SAFETY TRAINING: THE UTILISATION OF 4D ENABLED SERIOUS GAMES
    Dawood, Nashwan
    Miller, Geoff
    Patacas, Joao
    Kassem, Mohamad
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2014, 19 : 326 - 335
  • [42] Construction planning through 4D BIM-based virtual reality for light steel framing building projects
    Rashidi, Ali
    Yong, Wei Yin
    Maxwell, Duncan
    Fang, Yihai
    SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2023, 12 (05) : 1153 - 1173
  • [43] A Round-Robin-Based Resource Scheduling Method for D2D-Enabled Cellular Networks
    Chung, Yao-Liang
    2016 IEEE 6TH INTERNATIONAL CONFERENCE ON CONSUMER ELECTRONICS - BERLIN (ICCE-BERLIN), 2016,
  • [44] 4D BIM Based Optimal Flight Planning for Construction Monitoring Applications Using Camera-Equipped UAVs
    Ibrahim, Amir
    Golparvar-Fard, Mani
    COMPUTING IN CIVIL ENGINEERING 2019: DATA, SENSING, AND ANALYTICS, 2019, : 217 - 224
  • [45] Application of BIM-based 5D construction technique to Chenglang Bridge
    Wang, Huan
    Zheng, Rongyue
    Xiong, Feng
    PROCEEDINGS OF THE 2016 5TH INTERNATIONAL CONFERENCE ON SUSTAINABLE ENERGY AND ENVIRONMENT ENGINEERING (ICSEEE 2016), 2016, 63 : 31 - 38
  • [46] Research on fine management of construction project based on BIM5D technology
    Wu, Bei
    Cai, Yuping
    Shi, Yansiyi
    Gao, Zhanwang
    2020 INTERNATIONAL CONFERENCE ON GREEN DEVELOPMENT AND ENVIRONMENTAL SCIENCE AND TECHNOLOGY, 2020, 615
  • [47] Research and Application on 6D Integrated System in Metro Construction Based on BIM
    Zhou, Ying
    Ding, Lieyun
    Luo, Hanbin
    Chen, Lijuan
    ADVANCED MECHANICAL ENGINEERING, PTS 1 AND 2, 2010, 26-28 : 241 - 245
  • [48] Dynamic construction material layout planning optimization model by integrating 4D BIM
    Min-Yuan Cheng
    Nai-Wen Chang
    Engineering with Computers, 2019, 35 : 703 - 720
  • [49] Integrating 4D BIM and FDS to Simulate and Assess Fires in Buildings under Construction
    Sun, Qi
    Turkan, Yelda
    Fischer, Erica
    CONSTRUCTION RESEARCH CONGRESS 2022: COMPUTER APPLICATIONS, AUTOMATION, AND DATA ANALYTICS, 2022, : 977 - 986
  • [50] Enhancing Construction Management Education through 4D BIM and VR: Insights and Recommendations
    Abouelkhier, Narmin
    Shafiq, Muhammad Tariq
    Rauf, Abdul
    Alsheikh, Negmeldin
    BUILDINGS, 2024, 14 (10)