Integrated visualized time control system for repetitive construction projects

被引:52
|
作者
Elbeltagi, Emad [1 ]
Dawood, Mahmoud [1 ]
机构
[1] Mansoura Univ, Dept Struct Engn, Fac Engn, Mansoura, Egypt
关键词
Visualization; Project control; Repetitive projects; BIM; GIS; GEOGRAPHIC INFORMATION-SYSTEMS; COST; GIS;
D O I
10.1016/j.autcon.2011.03.012
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction control is an essential management function for successful delivery and achieving of construction projects' goals. Considerable research efforts have been done regarding project control. However, literature suffers from a lack of visualizing the controlling process. With the growth of using visualization techniques in construction, Building Information Modeling (BIM) and Geographic Information System (GIS) have recently attained a widespread contribution in visualization of construction progress. BIM is a process of creating virtual models data that represents building facilities. In this research, BIM represents a platform for nD (n-Dimensional) visualization of construction progress. The advantages of this paper stems from three main contributions for construction projects control: 1) developing of a mathematical model for time control of repetitive construction projects; 2) an automated system to dynamically integrate project progress with BIM technique; and 3) a GIS-based tool to visualize the progress of distributed sites. The developed model provides abundant information to help decision makers take the appropriate corrective actions. An example application is presented to demonstrate the applicability of the developed system. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:940 / 953
页数:14
相关论文
共 50 条
  • [41] Towards an integrated management system in infrastructure construction projects: a survey of practitioners in China
    Fu Chun
    He Man
    Zhang Fei-lian
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 1090 - 1095
  • [42] Minimizing duration and crew work interruptions of repetitive construction projects
    Altuwaim, Ayman
    El-Rayes, Khaled
    AUTOMATION IN CONSTRUCTION, 2018, 88 : 59 - 72
  • [43] SIMULATION AND OPTIMIZATION FOR CONSTRUCTION REPETITIVE PROJECTS USING PROMODEL AND SIMRUNNER
    Srisuwanrat, Chachrist
    Ioannou, Photios G.
    Tsimhoni, Omer
    2008 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2008, : 2402 - +
  • [44] Linear Scheduling Optimization Model for Planning Repetitive Construction Projects
    Monghasemi, Shahryar
    Abdallah, Moatassem
    Clevenger, Caroline
    CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 1129 - 1138
  • [45] CONTROL OF PROJECTS DURING CONSTRUCTION
    NINOS, GE
    WEARNE, SH
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1986, 80 : 931 - 943
  • [46] Utilizing Repetitive Sampling in the Construction of a Control Chart for Lindley Distribution with Time Truncation
    Sriramachandran, G. V.
    Gadde, Srinivasa Rao
    Aslam, Muhammad
    JOURNAL OF STATISTICAL THEORY AND APPLICATIONS, 2024, 23 (03): : 224 - 239
  • [47] Intelligent Planning and Control of Integrated Expert System Construction
    Rybina, Galina V.
    Blokhin, Yury M.
    Tarakchyan, Levon S.
    PROCEEDINGS OF THE THIRD INTERNATIONAL SCIENTIFIC CONFERENCE INTELLIGENT INFORMATION TECHNOLOGIES FOR INDUSTRY (IITI'18), VOL 2, 2019, 875 : 190 - 197
  • [48] Preview Repetitive Control for Linear Continuous-time System
    Li, Li
    Meng, Xiaohua
    Liao, Yonglong
    INTERNATIONAL JOURNAL OF CONTROL AUTOMATION AND SYSTEMS, 2023, 21 (02) : 508 - 518
  • [49] Meteorological Instruments Visualized Verification Integrated System
    Li Xindi
    SENSORS, MEASUREMENT AND INTELLIGENT MATERIALS II, PTS 1 AND 2, 2014, 475-476 : 803 - 806
  • [50] Discrete-time repetitive control system with multiple periods
    Yamada, M
    Riadh, Z
    Funahashi, Y
    6TH INTERNATIONAL WORKSHOP ON ADVANCED MOTION CONTROL, PROCEEDINGS, 2000, : 228 - 233