Integrated visualized time control system for repetitive construction projects

被引:52
|
作者
Elbeltagi, Emad [1 ]
Dawood, Mahmoud [1 ]
机构
[1] Mansoura Univ, Dept Struct Engn, Fac Engn, Mansoura, Egypt
关键词
Visualization; Project control; Repetitive projects; BIM; GIS; GEOGRAPHIC INFORMATION-SYSTEMS; COST; GIS;
D O I
10.1016/j.autcon.2011.03.012
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction control is an essential management function for successful delivery and achieving of construction projects' goals. Considerable research efforts have been done regarding project control. However, literature suffers from a lack of visualizing the controlling process. With the growth of using visualization techniques in construction, Building Information Modeling (BIM) and Geographic Information System (GIS) have recently attained a widespread contribution in visualization of construction progress. BIM is a process of creating virtual models data that represents building facilities. In this research, BIM represents a platform for nD (n-Dimensional) visualization of construction progress. The advantages of this paper stems from three main contributions for construction projects control: 1) developing of a mathematical model for time control of repetitive construction projects; 2) an automated system to dynamically integrate project progress with BIM technique; and 3) a GIS-based tool to visualize the progress of distributed sites. The developed model provides abundant information to help decision makers take the appropriate corrective actions. An example application is presented to demonstrate the applicability of the developed system. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:940 / 953
页数:14
相关论文
共 50 条
  • [31] An Integrated Control System for SMEs in the Construction Industry
    Pellicer, E.
    Pellicer, T. M.
    Catala, J.
    REVISTA DE LA CONSTRUCCION, 2009, 8 (02): : 4 - 17
  • [32] LOB and CPM Integrated Method for Scheduling Repetitive Projects
    Ammar, Mohammad A.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (01) : 44 - 50
  • [33] Integrated EDM and 4D BIM-Based Decision Support System for Construction Projects Control
    Ayman, Hassan Mohamed
    Mahfouz, Sameh Youssef
    Alhady, Ahmed
    BUILDINGS, 2022, 12 (03)
  • [34] Influence of structural system on the construction time and cost of residential projects
    Dimitrijevic, Boris
    Stojadinovic, Zoran
    Marinkovic, Dejan
    Dimitrijevic, Mirjana
    GRADEVINAR, 2019, 71 (08): : 681 - 693
  • [35] TIME AND COST INTERDEPENDENCE IN WATER SUPPLY SYSTEM CONSTRUCTION PROJECTS
    Zujo, Vahida
    Car-Pusic, Diana
    Zileska-Pancovska, Valentina
    Cecez, Marko
    TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2017, 23 (06) : 895 - 914
  • [36] A Fuzzy-Based Integrated Framework for Assessing Time Contingency in Construction Projects
    Pawan, Paijit
    Lorterapong, Pasit
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (03)
  • [37] Optimized scheduling and buffering of repetitive construction projects under uncertainty
    Bakry, Ibrahim
    Moselhi, Osama
    Zayed, Tarek
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2016, 23 (06) : 782 - 800
  • [38] Optimization of Stochastic Repetitive Construction Projects: Minimizing Duration Uncertainties
    Abosamra, Hussein
    ElSayad, Mohamed A.
    Eid, Mohamed S.
    Elhakeem, Ahmed
    COMPUTING IN CIVIL ENGINEERING 2023-VISUALIZATION, INFORMATION MODELING, AND SIMULATION, 2024, : 180 - 188
  • [39] Fuzzy Dynamic Programming for Optimized Scheduling of Repetitive Construction Projects
    Bakry, I.
    Moselhi, O.
    Zayed, T.
    PROCEEDINGS OF THE 2013 JOINT IFSA WORLD CONGRESS AND NAFIPS ANNUAL MEETING (IFSA/NAFIPS), 2013, : 1172 - 1176
  • [40] Development and Application of an Integrated Management System for Off-Site Construction Projects
    Jang, YeEun
    Lee, Jae-Man
    Son, JeongWook
    BUILDINGS, 2022, 12 (07)