Integrated visualized time control system for repetitive construction projects

被引:52
|
作者
Elbeltagi, Emad [1 ]
Dawood, Mahmoud [1 ]
机构
[1] Mansoura Univ, Dept Struct Engn, Fac Engn, Mansoura, Egypt
关键词
Visualization; Project control; Repetitive projects; BIM; GIS; GEOGRAPHIC INFORMATION-SYSTEMS; COST; GIS;
D O I
10.1016/j.autcon.2011.03.012
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction control is an essential management function for successful delivery and achieving of construction projects' goals. Considerable research efforts have been done regarding project control. However, literature suffers from a lack of visualizing the controlling process. With the growth of using visualization techniques in construction, Building Information Modeling (BIM) and Geographic Information System (GIS) have recently attained a widespread contribution in visualization of construction progress. BIM is a process of creating virtual models data that represents building facilities. In this research, BIM represents a platform for nD (n-Dimensional) visualization of construction progress. The advantages of this paper stems from three main contributions for construction projects control: 1) developing of a mathematical model for time control of repetitive construction projects; 2) an automated system to dynamically integrate project progress with BIM technique; and 3) a GIS-based tool to visualize the progress of distributed sites. The developed model provides abundant information to help decision makers take the appropriate corrective actions. An example application is presented to demonstrate the applicability of the developed system. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:940 / 953
页数:14
相关论文
共 50 条
  • [1] RESOURCE LEVELLING IN REPETITIVE CONSTRUCTION PROJECTS WITH INTERRUPTIONS: AN INTEGRATED APPROACH
    Dai, Guyu
    Liao, Mingjuan
    Zhang, Renqian
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2023, 29 (02) : 93 - 106
  • [2] An integrated system for ship construction projects control using risk analysis
    Pires, Floriano C. M.
    Assis, Luiz Felipe
    Rezende, Mauro
    Vieira, Claudio L. Baraúna
    Botelho, Silvia S. C.
    Filho, Nelson Duarte
    Marine Systems and Ocean Technology, 2013, 8 (02) : 87 - 93
  • [3] INTEGRATED MANAGEMENT-SYSTEM FOR CONSTRUCTION PROJECTS
    KOUSKOULAS, V
    GRAZIOLI, M
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1977, 103 (01): : 101 - 112
  • [4] AN INTEGRATED INTELLIGENT SYSTEM FOR SCHEDULING CONSTRUCTION PROJECTS
    SOH, CK
    PHANG, KW
    WONG, WP
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 1995, 108 (01) : 36 - 37
  • [5] AN INTEGRATED INTELLIGENT SYSTEM FOR SCHEDULING CONSTRUCTION PROJECTS
    SOH, CK
    PHANG, KW
    WONG, WP
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 1993, 97 (04) : 156 - 162
  • [6] Hybrid Time-Cost Optimization of Nonserial Repetitive Construction Projects
    Ezeldin, A. Samer
    Soliman, Ahmed
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (01) : 42 - 55
  • [7] Organization of the integrated control of the implementation of sophisticated construction projects
    Leybman, Dmitriy
    Sborshchikov, Sergey
    Kochenkova, Elizaveta
    VI INTERNATIONAL SCIENTIFIC CONFERENCE INTEGRATION, PARTNERSHIP AND INNOVATION IN CONSTRUCTION SCIENCE AND EDUCATION (IPICSE-2018), 2018, 251
  • [8] Optimized acceleration of repetitive construction projects
    Bakry, Ibrahim
    Moselhi, Osama
    Zayed, Tarek
    AUTOMATION IN CONSTRUCTION, 2014, 39 : 145 - 151
  • [9] Cost and time control of construction projects in the UK
    Yakubu, Olawale
    Sun, Ming
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2007, : 278 - 286
  • [10] Integrated knowledge management model and system for construction projects
    Kanapeckiene, L.
    Kaklauskas, A.
    Zavadskas, E. K.
    Seniut, M.
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2010, 23 (07) : 1200 - 1215