Optimal segmentation of projects - Schedule and cost considerations

被引:3
|
作者
Shtub, A [1 ]
Raz, T
机构
[1] TEL AVIV UNIV, SCH ENGN, DEPT IND ENGN, IL-69978 TEL AVIV, ISRAEL
[2] LEON E RECANATI GRAD SCH BUSINESS ADM RAMAT AVIV, FAC MANAGEMENT, IL-69978 TEL AVIV, ISRAEL
关键词
project segmentation; project scheduling; project control; project planning;
D O I
10.1016/0377-2217(95)00260-X
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In certain types of projects, the same sequence of activities is performed throughout the various physical parts of the project (e.g., road construction). By dividing the project into segments and working in parallel, the duration of the project can be reduced, with a resulting increase in direct costs. in this paper we consider the problem of finding the optimal number of segments that minimizes total project cost, for linear cost and duration functions. We begin by formulating and solving a mathematical programming model for homogeneous projects, and, by using the concept of work contents, we extend the solution to non-homogeneous projects.
引用
收藏
页码:278 / 283
页数:6
相关论文
共 50 条
  • [21] Quantifying the Impact of Technology Utilization on Schedule and Cost Performance in Construction Projects
    Salih, Fareed
    El-adaway, Islam H.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (08)
  • [22] Information technology for better management of change, cost and schedule in construction projects
    Massachusetts Inst of Technology, Cambridge, United States
    [J]. Comput Civ Eng (New York), (613-619):
  • [23] PREDICTING THE SCHEDULE AND COST PERFORMANCE IN PUBLIC SCHOOL BUILDING PROJECTS IN TAIWAN
    Juan, Yi-Kai
    Liou, Ling-Er
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2022, 28 (01) : 51 - 67
  • [24] Design-Build for Transportation Projects: Cost and Schedule Change Performance Analysis
    El Asmar, Mounir
    Ramsey, David
    Gibson, G. Edward, Jr.
    Bearup, Wylie
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2020, 12 (01)
  • [25] COST ESCALATION, SCHEDULE OVERRUNS AND QUALITY SHORTFALLS ON CONSTRUCTION PROJECTS: THE CASE OF ZAMBIA
    Muya, Mundia
    Kaliba, Chabota
    Sichombo, Balimu
    Shakantu, Winston
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2013, 13 (01) : 53 - 68
  • [26] Cost and Schedule Performance Analysis of Transportation Public-Private Partnership Projects
    Ramsey, David
    El Asmar, Mounir
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2020, 12 (01)
  • [27] Understanding the Key Risks Affecting Cost and Schedule Performance of Modular Construction Projects
    Abdul Nabi, Mohamad
    El-adaway, Islam H.
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2021, 37 (04)
  • [28] Risk evaluation of schedule and cost for projects based on Monte-Carlo simulation
    Chen, Jun-fei
    Chen, Zhi-song
    [J]. DYNAMICS OF CONTINUOUS DISCRETE AND IMPULSIVE SYSTEMS-SERIES A-MATHEMATICAL ANALYSIS, 2006, 13 : 1215 - 1218
  • [29] Recipes for Cost and Schedule Successes in Industrial Modular Projects: Qualitative Comparative Analysis
    Choi, Jin Ouk
    O'Connor, James T.
    Kim, Tae Wan
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (10)
  • [30] Effect of Change Orders on Cost and Schedule Overruns of School Building Renovation Projects
    Shrestha, Pramen P.
    Zeleke, Haileab
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2018, 10 (04)