Quantifying the Impact of Technology Utilization on Schedule and Cost Performance in Construction Projects

被引:0
|
作者
Salih, Fareed [1 ]
El-adaway, Islam H. [2 ,3 ,4 ,5 ]
机构
[1] Missouri Univ Sci & Technol, Dept Civil Architectural & Environm Engn, Rolla, MO 65409 USA
[2] Missouri Univ Sci & Technol, Acad Partnerships, 228 Butler Carlton Hall,1401 N Pine St, Rolla, MO 65401 USA
[3] Missouri Univ Sci & Technol, Construct Engn & Management, 228 Butler Carlton Hall,1401 N Pine St, Rolla, MO 65401 USA
[4] Missouri Univ Sci & Technol, Missouri Consortium Construct Innovat, Dept Civil Architectural & Environm Engn, 228 Butler Carlton Hall,1401 N Pine St, Rolla, MO 65401 USA
[5] Missouri Univ Sci & Technol, Dept Engn Management & Syst Engn, 228 Butler Carlton Hall,1401 N Pine St, Rolla, MO 65401 USA
关键词
MANAGEMENT; PREDICTION; BIM;
D O I
10.1061/JCEMD4.COENG-14679
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
There has been a plethora of research on the performance of schedule and cost in construction projects. However, current research falls short in investigating the combined contribution of different construction technologies on project performance metrics. Specifically, none of the previous efforts have used integrated earned value management (EVM) parameters and utilized construction technologies to assess project schedule and cost performance. This paper fills this knowledge gap. To this end, a multistep research methodology was employed to (1) explore the utilization ratings of 13 construction technologies based on data collected from 52 industry experts; (2) rank these technologies in terms of their contribution to schedule and cost savings; (3) map the utilization ratings of construction technologies to schedule and cost variances by leveraging data from 48 construction projects with varying levels and scopes of technology integration to gauge the impact of using these technologies; and (4) develop an associated decision-support model that underwent rigorous verification under extreme conditions and sensitivity analysis. This study makes a noteworthy contribution to the existing body knowledge, revealing that the major drivers for schedule savings are building information modeling (BIM), unmanned aerial vehicles (UAVs), and augmented/virtual reality (AR/VR), while additive manufacturing (AM), digital twin (DT), and Internet of Things (IoT) are the most significant contributors to cost savings. Moreover, the study reveals strong correlations between various technologies, such as UAVs and laser scanning, geographic information system (GIS) and GPS, AR/VR and digital twins, as well as robotics/automation and AR/VR. Furthermore, the study introduces a novel model that enhances the prediction of project performance, specifically in terms of schedule and cost variations resulting from the adoption of various construction technologies. Eventually, it improves the decision-making process related to the deployment of the investigated construction technologies.
引用
收藏
页数:16
相关论文
共 50 条
  • [1] Information technology for better management of change, cost and schedule in construction projects
    PenaMora, F
    Chen, H
    [J]. COMPUTING IN CIVIL ENGINEERING, 1996, : 613 - 619
  • [2] Information technology for better management of change, cost and schedule in construction projects
    Massachusetts Inst of Technology, Cambridge, United States
    [J]. Comput Civ Eng (New York), (613-619):
  • [3] Understanding the Key Risks Affecting Cost and Schedule Performance of Modular Construction Projects
    Abdul Nabi, Mohamad
    El-adaway, Islam H.
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2021, 37 (04)
  • [4] Probability and Impact Perspectives on Cost and Schedule Risks in International Construction Projects: An Empirical Investigation
    Won, Jin Woo
    Jung, Wooyong
    Baek, Seungwon
    Han, Seung Heon
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2024, 28 (07) : 2600 - 2612
  • [5] Quantifying costs of the productivity loss due to schedule changes in construction projects
    Lee, Jae-Seob
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (01) : 56 - 73
  • [6] Quantifying schedule risk in construction projects using Bayesian belief networks
    Luu, Van Truong
    Kim, Soo-Yong
    Nguyen Van Tuan
    Ogunlana, Stephen O.
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2009, 27 (01) : 39 - 50
  • [7] Quantifying the Impact of Change on the Progress of Construction Projects
    Alzraiee, Hani
    Zayed, Tarek
    [J]. CONSTRUCTION RESEARCH CONGRESS 2018: CONSTRUCTION PROJECT MANAGEMENT, 2018, : 701 - 711
  • [8] Cost escalation and schedule delays in road construction projects in Zambia
    Kaliba, Chabota
    Muya, Mundia
    Mumba, Kanyuka
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2009, 27 (05) : 522 - 531
  • [9] Cost, Change Order, and Schedule Performance of Highway Projects
    Shrestha, Bandana
    Shrestha, Pramen P.
    Maharjan, Ruiko
    Gransberg, Douglas
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2022, 14 (01)
  • [10] Impact of Utilizing Construction Engineering and Inspection Consultants on Highway Construction Project Cost and Schedule Performance
    Li, Ying
    Al-Haddad, Sara
    Taylor, Timothy R. B.
    Goodrum, Paul M.
    Sturgill, Roy E.
    [J]. TRANSPORTATION RESEARCH RECORD, 2019, 2673 (11) : 716 - 725